How To Fix MMRP01521 - A line balancing relationship is missing for activity &2 (comp.var. &1)


MMRP01521 - Overview

  • Message type: E = Error

  • Message class: MMRP01 - Rapid Planning Matrix

  • Message number: 521

  • Message text: A line balancing relationship is missing for activity &2 (comp.var. &1)

  • Show details Hide details
  • What causes this issue?

    In the line balance, you have not assigned the mode of the activity
    &V2& to the line segment where this activity is to take place.

    System Response

    This activity is not included in the activity matrix. As the component
    variant &V1& is also used for this activity, a default assignment has
    been made where possible for this variant (see other error
    messages/warnings).
    Note:
    If there is no warning for the default assignment for item variant &V1&
    in the log, it has not been added to the component variant matrix. In
    this case, check whether you have maintained the line balancing at the
    right places in the line hierarchy (line network, lines, alternative
    lines) and whether you have set the indicator <DS:DE.PPE_NOT_LBXREL>Do
    Not Consider Line Balances During Explosion</>.

    How to fix this error?

    In a line balance, assign the activity &V2& to the line segment where
    it is to take place.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


MMRP01521 - Details

  • The SAP error message MMRP01521 indicates that there is a missing line balancing relationship for a specific activity in the context of production planning or process management. This error typically arises in the context of production orders, where the system expects a defined relationship between activities for proper scheduling and resource allocation.
    
    Cause: The error can occur due to several reasons: Missing Configuration: The line balancing relationships may not have been configured correctly in the system for the specific activity or component variant. Incorrect Master Data: The master data for the production process may be incomplete or incorrect, leading to the absence of necessary relationships. Changes in Production Process: If there have been recent changes to the production process or routing, the line balancing relationships may not have been updated accordingly. Inconsistent Data: There may be inconsistencies in the data related to the production order or the routing that prevent the system from establishing the necessary

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


MMRP01521 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author