Do you have any question about this error?
Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 519
Message text: RPM already running in parallel at &1 (&2 products)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MMRP01519
- RPM already running in parallel at &1 (&2 products) ?The SAP error message MMRP01519 indicates that a "Replenishment Planning Run" (RPM) is already running in parallel for the specified products. This error typically occurs when a replenishment planning job is triggered while another instance of the same job is still executing.
Cause:
- Concurrent Execution: The most common cause is that the replenishment planning job has been initiated multiple times for the same product or set of products, leading to a conflict.
- Long-Running Jobs: If the previous job takes longer than expected to complete, it may overlap with a new job initiation.
- System Configuration: The system may be configured to allow multiple instances of the same job, but it is not advisable for replenishment planning due to potential data inconsistencies.
Solution:
- Check Running Jobs: Use transaction codes like SM37 (Job Monitoring) to check if the replenishment planning job is still running. If it is, you may need to wait for it to complete.
- Cancel or Terminate: If the job is stuck or taking too long, you may need to cancel or terminate it. Be cautious with this approach, as it may lead to data inconsistencies.
- Avoid Overlapping Jobs: Ensure that the job scheduling is managed properly to avoid overlapping runs. This can be done by:
- Scheduling jobs at intervals that allow sufficient time for completion.
- Implementing checks in your job scheduling logic to prevent multiple instances from being triggered.
- Review Job Configuration: Check the configuration settings for the replenishment planning job to ensure that it is set up correctly and that it does not allow for concurrent executions.
Related Information:
By following these steps, you should be able to resolve the MMRP01519 error and prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
MMRP01518
RPM run completed without fatal error at &1
What causes this issue? The RPM planning run was completed without any fatal errors.System Response All related planning matrices have been recreate...
MMRP01517
There was at least one serious error during the planning run
What causes this issue? The other error messages give you information about the cause of the error. You find them in the application log (transaction...
MMRP01520
Component variant &1 not assigned to an activity for plan &2
What causes this issue? You have not assigned an activity in the process structure &V2& of the iPPE to the component variant &V1&.Sys...
MMRP01521
A line balancing relationship is missing for activity &2 (comp.var. &1)
What causes this issue? In the line balance, you have not assigned the mode of the activity &V2& to the line segment where this activity is t...
Click on this link to search all SAP messages.