Do you have any question about this error?
Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 520
Message text: Component variant &1 not assigned to an activity for plan &2
You have not assigned an activity in the process structure &V2& of the
iPPE to the component variant &V1&.
This variant is not included in the planning matrix.
Assign an activity in the process structure, that you have created for
the product to be planned, to the component variant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MMRP01520
- Component variant &1 not assigned to an activity for plan &2 ?The SAP error message MMRP01520 indicates that a component variant (identified by &1) is not assigned to an activity for a specific plan (identified by &2). This error typically occurs in the context of production planning or material requirements planning (MRP) when the system is trying to process a plan that references a component variant that has not been properly linked to an activity.
Cause:
- Missing Assignment: The component variant has not been assigned to the relevant activity in the planning setup.
- Configuration Issues: There may be issues with the configuration of the variant or the activity in the system.
- Data Inconsistencies: There could be inconsistencies in the master data or planning data that prevent the system from recognizing the assignment.
- Incorrect Planning Parameters: The planning parameters or settings may not be correctly defined for the component variant.
Solution:
- Check Assignment: Verify that the component variant is correctly assigned to the relevant activity in the planning setup. This can typically be done in the configuration settings for the production or planning module.
- Update Master Data: Ensure that the master data for the component variant and the activity is complete and accurate. This includes checking the material master, BOM (Bill of Materials), and routing.
- Review Planning Parameters: Check the planning parameters and settings to ensure they are correctly defined for the component variant and the activity.
- Reassign Component Variant: If necessary, reassign the component variant to the activity using the appropriate transaction codes (e.g., CS01 for creating BOMs, CA01 for creating routings).
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration and assignment processes.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP specialist or support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MMRP01519
RPM already running in parallel at &1 (&2 products)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MMRP01518
RPM run completed without fatal error at &1
What causes this issue? The RPM planning run was completed without any fatal errors.System Response All related planning matrices have been recreate...
MMRP01521
A line balancing relationship is missing for activity &2 (comp.var. &1)
What causes this issue? In the line balance, you have not assigned the mode of the activity &V2& to the line segment where this activity is t...
MMRP01522
Mode &1 is not assigned to line &2
What causes this issue? You have not assigned the mode &V1& to a line segment of the line &V2&.System Response The activity is not i...
Click on this link to search all SAP messages.