Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 223
Message text: Fixing/ATP not possible because explosion not yet carried out (start RPM)
The order is in a long-term planning matrix.
Orders in long-term planning matrices cannot be fixed or checked using
the ATP check.
The order cannot be fixed or checked using the ATP check until it lies
within the detailed scheduling horizon for the planning matrix.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MMRP01223
- Fixing/ATP not possible because explosion not yet carried out (start RPM) ?The SAP error message MMRP01223, which states "Fixing/ATP not possible because explosion not yet carried out (start RPM)," typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with the planning and execution of production orders or requirements planning.
Cause: This error generally indicates that the system is unable to perform the Available-to-Promise (ATP) check or fixing of a requirement because the explosion of the bill of materials (BOM) has not yet been executed. The explosion process is essential for determining the components required for production and their availability.
Solution: To resolve this error, you can follow these steps: Check BOM Configuration: Ensure that the BOM for the material in question is correctly configured and active. If the BOM is not maintained or is inactive, the explosion cannot be carried out. Run the Explosion: Manually trigger the explosion of the BOM. This can typically be done through the following
Get instant SAP help. Sign up for our Free Essentials Plan.
MMRP01222
Order BOM is not available as it has not yet been exploded (start RPM)
What causes this issue? The order is in a long-term planning matrix. The settings for the finished product mean that the crosses are to be deleted fr...
MMRP01221
Selection with order reference not possible for aggregated requirements
What causes this issue? You tried to enter a selection criterion with an order reference (for example, finished product, order number, start date, ex...
MMRP01224
Backflush not possible as explosion has not been carried out (start RPM)
What causes this issue? The order is in a long-term planning matrix.System Response Orders in long-term planning matrices cannot be backflushed.How ...
MMRP01225
Component variant &1 cannot be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.