Do you have any question about this error?
Message type: E = Error
Message class: MLCCS - Message for Actual Costing
Message number: 201
Message text: The standard price split of material &1 does not contain any values
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MLCCS201
- The standard price split of material &1 does not contain any values ?The SAP error message MLCCS201 indicates that there is an issue with the standard price split for a material in the system. Specifically, it means that the standard price split for the specified material does not contain any values, which can lead to problems in inventory valuation and cost accounting.
Cause:
- Missing Price Data: The standard price for the material has not been maintained or updated in the system.
- Incorrect Configuration: There may be an issue with the configuration of the material master data or the costing variant.
- Data Migration Issues: If data was migrated from another system, the standard price split may not have been correctly transferred.
- Material Type: The material type may not be set up to allow for standard pricing.
- Costing Run Issues: If a costing run was not executed properly, it may not have generated the necessary price split data.
Solution:
- Check Material Master: Go to the material master record (transaction code MM03) and verify that the standard price is maintained correctly in the Accounting view.
- Maintain Standard Price: If the standard price is missing, you can maintain it using transaction code CK11N (Create Cost Estimate with Quantity Structure) or CK40N (Change Cost Estimate).
- Review Costing Variant: Ensure that the costing variant used for the material is correctly configured to allow for standard price calculations.
- Execute Costing Run: If necessary, execute a costing run to generate the standard price split. Use transaction CK40N to perform this action.
- Check for Data Migration Issues: If the material was recently created or migrated, ensure that all necessary data was transferred correctly.
- Consult Documentation: Review SAP documentation or consult with your SAP support team for specific configuration settings related to your organization’s setup.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MLCCS105
User control: ignore change of cost component structure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MLCCS104
User control: split differences according to standard price
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MLCCS202
Value of cost component split is initial (KALNR = &1, object = &2)
What causes this issue? During rescaling of a cost component split, the value of the original cost component split is initial. Therefore, the cost co...
MLCCS203
Orig. quant. for quant. displ. factor is initial (KALNR= &1, object= &2)
What causes this issue? During quantity-based rescaling of a cost component split, the original quantity is zero. Therefore, the cost component split...
Click on this link to search all SAP messages.