Do you have any question about this error?
Message type: E = Error
Message class: MDGBP - Master Data Governance: Business Partner specific messages
Message number: 040
Message text: Field &1-&2 cannot be scheduled
You tried to schedule a change to field &MSGV1&-&MSGV2&. The properties
of the assigned field group do not permit such an activity.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Set the <ZK>plannable </>flag in the corresponding field group.
Error message extract from SAP system. Copyright SAP SE.
MDGBP040
- Field &1-&2 cannot be scheduled ?The SAP error message MDGBP040, which states "Field &1-&2 cannot be scheduled," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that there is an issue with the scheduling of a particular field or characteristic in the planning process.
Cause:
The error can be caused by several factors, including:
- Missing or Incorrect Data: The fields referenced in the error message may not have the necessary data or may be incorrectly configured in the system.
- Scheduling Parameters: The scheduling parameters for the material or production order may not be set correctly, preventing the system from scheduling the operation.
- Resource Availability: The resources (e.g., machines, labor) required for the operation may not be available or may be incorrectly defined.
- Master Data Issues: Problems with master data, such as material master, routing, or work center, can lead to scheduling issues.
- Configuration Settings: Incorrect configuration settings in the planning area or planning strategy can also lead to this error.
Solution:
To resolve the MDGBP040 error, you can take the following steps:
- Check the Fields: Review the fields indicated in the error message (replace &1 and &2 with the actual field names) to ensure they are correctly populated and configured.
- Review Scheduling Parameters: Verify the scheduling parameters for the material or production order. Ensure that they are set correctly and that the scheduling type is appropriate.
- Resource Availability: Check the availability of resources required for the operation. Ensure that they are defined correctly in the system and that there are no conflicts.
- Master Data Review: Examine the relevant master data (material master, routing, work center) for any inconsistencies or missing information.
- Configuration Settings: Review the configuration settings related to the planning area and strategy to ensure they align with your business processes.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and its context.
Related Information:
By following these steps, you should be able to identify the root cause of the MDGBP040 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MDGBP039
Field &1-&2 not ready for input due to Customizing settings
What causes this issue? You have tried to change field &MSGV1&-&MSGV2& in direct input mode. This is not possible, because the Custom...
MDGBP038
There is no relevant data screen; all fields are hidden
What causes this issue? No relevant data screen exists. In the data screens you have selected, all of the fields are hidden as a result of the Custom...
MDGBP041
During activation, you must enter the field group for each field group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MDGBP042
Function &1 is controlled by the field group; navigation is not possible
What causes this issue? The settings for function &V1& are such that this function can be activated by way of a field group. In this case you...
Click on this link to search all SAP messages.