Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 482
Message text: No capacity requirements determined, see customizing
No capacity requirements were calculated as, in Cusotmizing, the
parameters have been set so that no capacity requirements are to be
calculated.
The indicator, "Create capacity requirements" was not set when defining
the scheduling levels.
In Customizing, it was not defined that scheduling is to be carried out
using the routing for the scheduling horizon in which the planned order
lies. Capacity requirements are only calculated if a planned order is
scheduled using either the routing, the rate routing or a master
recipe.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you want the system to calculate capacity requirements, maintain the
parameters correspondingly in Customizing.
When defining the scheduling levels, the indicator, "create capacity
requirements" was not set.
In Customizing, define the scheduling horizon appropriately in which
you want to schedule planned orders via the routing.
Error message extract from SAP system. Copyright SAP SE.
MD482
- No capacity requirements determined, see customizing ?The SAP error message MD482 ("No capacity requirements determined, see customizing") typically occurs in the context of production planning and capacity planning within the SAP system. This message indicates that the system was unable to determine capacity requirements for a particular production order or planning scenario. Here are the potential causes, solutions, and related information for this error: Causes: Missing Master Data: The relevant master data (like work centers, routing, or production versions) may not be properly maintained or may be missing. Incorrect Configuration: The configuration settings in the customizing (SPRO) may not be set up correctly for capacity planning. Routing Issues: The routing for the material may not be defined correctly, or it may not be assigned to the production version. Work Center Issues: The work center may not have the necessary capacity defined, or it may not be assigned to the relevant production process. Planning Parameters: The planning parameters for the material may not
Get instant SAP help. Sign up for our Free Essentials Plan.
MD481
Scheduling parameters are not maintained in Customizing
What causes this issue? Either the scheduling levels, the control parameters for scheduling or the scheduling type could not be determined in Customi...
MD480
Scheduling carried out successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD483
Routing does not exist
What causes this issue? Routing selected could not be read from the database.System Response The planned order is not scheduled and capacity require...
MD484
No valid routing can be selected
What causes this issue? The automatic selecction for routing selection (routing, rate routing or master recipe) is not possible.System Response The ...
Click on this link to search all SAP messages.