Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 480
Message text: Scheduling carried out successfully
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD480
- Scheduling carried out successfully ?The SAP error message MD480, which states "Scheduling carried out successfully," is not actually an error message but rather an informational message indicating that the scheduling process for a particular material or production order has been completed successfully. This message typically appears in the context of materials management and production planning within SAP.
Cause:
Since MD480 is an informational message and not an error, there is no specific solution required. However, if you are looking to ensure that the scheduling process is functioning as expected, consider the following:
Review Scheduling Parameters: Ensure that the parameters used for scheduling (like lead times, production times, etc.) are correctly defined in the material master and production order.
Check Results: After receiving the MD480 message, you can check the scheduling results to confirm that the dates and times align with your expectations. You can do this by reviewing the production order or material availability.
Monitor for Related Messages: If you are expecting a different outcome or if there are subsequent messages that indicate issues (like MD041, which indicates that a material is not available), you should investigate those messages for further action.
Consult Documentation: If you are unsure about the scheduling results, refer to SAP documentation or consult with your SAP support team for clarification on how to interpret the scheduling results.
In summary, MD480 is a positive confirmation of successful scheduling, and you should focus on verifying the results and ensuring that all related parameters are correctly set up.
Get instant SAP help. Start your 7-day free trial now.
MD461
Start Date Set to Current Date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD460
MRP views for &1 not maintained
What causes this issue? The MRP view for the user &V1& has not been maintained. In order to be able to access the mini-applications in MRP, a...
MD481
Scheduling parameters are not maintained in Customizing
What causes this issue? Either the scheduling levels, the control parameters for scheduling or the scheduling type could not be determined in Customi...
MD482
No capacity requirements determined, see customizing
What causes this issue? No capacity requirements were calculated as, in Cusotmizing, the parameters have been set so that no capacity requirements ar...
Click on this link to search all SAP messages.