Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 461
Message text: Start Date Set to Current Date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD461
- Start Date Set to Current Date ?The SAP error message MD461 "Start Date Set to Current Date" typically occurs in the context of Material Requirements Planning (MRP) when a user attempts to create or modify a planning scenario, and the system detects that the start date for the planning run is set to the current date. This can happen in various transactions related to MRP, such as when running MRP for a specific material or during the planning run setup.
Cause:
- Current Date Setting: The error indicates that the start date for the planning run is set to the current date, which may not be valid for the operation you are trying to perform.
- Planning Parameters: The planning parameters or settings may not be configured correctly, leading to the system defaulting to the current date.
- User Input: The user may have inadvertently set the start date to the current date without realizing it.
Solution:
Change the Start Date:
- Navigate to the transaction where the error occurred (e.g., MD01, MD02, etc.).
- Look for the field where the start date is specified.
- Change the start date to a future date that is appropriate for the planning run you are executing.
Check Planning Parameters:
- Review the planning parameters in the configuration settings to ensure they are set correctly.
- Make sure that the planning horizon is defined properly and that it allows for future dates.
Review User Input:
- If the start date was manually entered, double-check the input to ensure it aligns with the requirements of the planning process.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the transaction you are using, as there may be additional context or requirements for the start date.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP processes.
Get instant SAP help. Start your 7-day free trial now.
MD460
MRP views for &1 not maintained
What causes this issue? The MRP view for the user &V1& has not been maintained. In order to be able to access the mini-applications in MRP, a...
MD459
The previous material is displayed again. Press ENTER.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD480
Scheduling carried out successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...