Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 182
Message text: Lot size procedure &1 being used is not gross lot size procedure
The lot-sizing procedure entered does not correspond to the
requirements of a long-term lot size. Only lot-for-lot order quantity
and period lot-sizing procedures are allowed to be a gross lot-sizing
procedure. The corresponding parameters in the lot-sizing procedure
have to be valid for the whole horizon.
Choose a lot-for-lot order quantity or period lot-sizing procedure.
Error message extract from SAP system. Copyright SAP SE.
MD182
- Lot size procedure &1 being used is not gross lot size procedure ?The SAP error message MD182 indicates that there is an issue with the lot size procedure being used in the material master data. Specifically, it states that the lot size procedure defined for a material is not a gross lot size procedure, which is required for certain planning scenarios in SAP.
Cause: Incorrect Lot Size Procedure: The material master record is configured with a lot size procedure that is not compatible with the planning strategy being used. For example, if the planning strategy requires a gross lot size procedure but the material is set up with a different type (like a fixed lot size), this error will occur. Planning Strategy Mismatch: The planning strategy assigned to the material may require a specific lot size procedure that is not currently set in the material master.
Configuration Issues: There may be issues in the configuration of the lot size procedures in the system, leading to the
Get instant SAP help. Sign up for our Free Essentials Plan.
MD181
Enter a gross lot size for the scenario
What causes this issue? The 'Use gross lot size' indicator was set for the long-term planning scenario. However, no lot-sizing procedure ha...
MD180
*** COMMENT: Gross lot sizes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD183
Lot size procedure &1 is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD190
Different periods not possible during activation
What causes this issue? During activiation of the planned independent requirement version, several versions with varying activation periods were sele...
Click on this link to search all SAP messages.