Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 181
Message text: Enter a gross lot size for the scenario
The 'Use gross lot size' indicator was set for the long-term planning
scenario. However, no lot-sizing procedure has been entered. It is
necessary to enter the appropriate lot size if the same lot-sizing
procedure is to be used in long-term planning.
Enter a gross lot size or deselect the 'Use gross lot size' indicator.
Error message extract from SAP system. Copyright SAP SE.
MD181
- Enter a gross lot size for the scenario ?The SAP error message MD181, which states "Enter a gross lot size for the scenario," typically occurs in the context of Material Requirements Planning (MRP) when you are trying to create or modify a planning scenario in SAP. This error indicates that the system requires a gross lot size to be defined for the planning scenario you are working with.
Cause:
- Missing Gross Lot Size: The most common cause of this error is that the gross lot size field is not filled in the planning scenario configuration. The gross lot size is essential for MRP calculations as it determines the minimum quantity that can be produced or procured.
- Incorrect Configuration: The planning scenario may not be properly configured, leading to missing parameters that are necessary for MRP processing.
- Data Entry Error: There might be a data entry error where the gross lot size was intended to be entered but was overlooked.
Solution:
To resolve the MD181 error, you can follow these steps:
Access the Planning Scenario:
- Go to the relevant transaction in SAP (e.g., transaction code
MD61
for planning scenarios).Enter Gross Lot Size:
- Locate the field for "Gross Lot Size" in the planning scenario screen.
- Enter a valid gross lot size value. This value should reflect the minimum quantity that can be produced or procured based on your business requirements.
Check Configuration:
- If you are unsure about the appropriate gross lot size, consult with your production planning or materials management team to determine the correct value.
- Ensure that all other required fields in the planning scenario are also filled out correctly.
Save Changes:
- After entering the gross lot size and verifying other fields, save your changes.
Re-run MRP:
- Once the gross lot size is entered, you can re-run the MRP process to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to this error message.
Get instant SAP help. Start your 7-day free trial now.
MD180
*** COMMENT: Gross lot sizes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD174
Check dependent data: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD182
Lot size procedure &1 being used is not gross lot size procedure
What causes this issue? The lot-sizing procedure entered does not correspond to the requirements of a long-term lot size. Only lot-for-lot order quan...
MD183
Lot size procedure &1 is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...