Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 122
Message text: You have not yet allocated any plants
To carry out long-term planning, you use the scenario to control which
plants are included in the planning run.
The total planning run can only be carried out for the plants
determined per scenario.
Enter the plants for which you want to control long-term planning
using this scenario.
Error message extract from SAP system. Copyright SAP SE.
MD122
- You have not yet allocated any plants ?The SAP error message MD122, which states "You have not yet allocated any plants," typically occurs in the context of Material Requirements Planning (MRP) when you are trying to run MRP for a material or a group of materials, but no plants have been assigned to the relevant MRP area or the material master record.
Cause:
- Missing Plant Assignment: The material master record does not have any plants assigned to it. This can happen if the material has not been created or maintained properly.
- MRP Area Configuration: If you are using MRP areas, the specific MRP area may not have any plants assigned.
- Incorrect MRP Type: The MRP type for the material may not be set up correctly, leading to the system not recognizing any plants for MRP processing.
Solution:
Check Material Master:
- Go to transaction code
MM03
(Display Material) and enter the material number.- Check the "Plant Data" views (e.g., Basic Data 1, MRP 1, MRP 2) to ensure that the plant is assigned to the material.
- If no plants are assigned, you will need to create or update the material master record using transaction code
MM01
(Create Material) orMM02
(Change Material).Assign Plants:
- If the material is not assigned to any plants, you can assign the relevant plants in the material master record.
- Ensure that the plant is active and that the necessary data (like storage location, MRP data, etc.) is filled out.
Check MRP Area Settings:
- If you are using MRP areas, ensure that the MRP area is correctly configured and that it has the necessary plants assigned.
- You can check this in the configuration settings for MRP areas.
Review MRP Type:
- Ensure that the MRP type is set correctly for the material. Common MRP types include PD (MRP), VB (Manual Reorder Point), etc.
- You can check and change the MRP type in the MRP 1 view of the material master.
Run MRP Again:
- After making the necessary changes, try running the MRP process again to see if the error persists.
Related Information:
MM01
: Create MaterialMM02
: Change MaterialMM03
: Display MaterialMD01
: MRP RunBy following these steps, you should be able to resolve the MD122 error and successfully allocate plants for your materials in SAP.
Get instant SAP help. Start your 7-day free trial now.
MD121
You have not yet allocated any planned indep.reqmts versions
What causes this issue? To carry out long-term planning with a planning scenario, you must determine which independent requirements versions are to b...
MD120
Plant & has already been allocated
What causes this issue? A planning scenario can only be assigned to a plant once.System Response The system issues an error message and will not all...
MD123
Planning scenario & was released and saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD124
Version & of the purchasing info system is already being used
What causes this issue? Version &V1& of the purchasing info system already exists.System Response The results of the planning scenario can b...
Click on this link to search all SAP messages.