Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 120
Message text: Plant & has already been allocated
A planning scenario can only be assigned to a plant once.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MD120
- Plant & has already been allocated ?The SAP error message MD120 indicates that a plant has already been allocated for a specific material or production order. This error typically arises in the context of Material Requirements Planning (MRP) or production planning processes when there is an attempt to allocate or assign a plant that is already in use for the same material or order.
Cause:
- Duplicate Allocation: The plant is already assigned to another order or process for the same material.
- Configuration Issues: There may be configuration settings in the system that prevent multiple allocations for the same plant.
- Data Integrity Issues: There could be inconsistencies in the master data or transaction data that lead to this error.
- Concurrent Processes: If multiple users or processes are trying to allocate the same plant simultaneously, it can lead to this error.
Solution:
- Check Existing Allocations: Review the current allocations for the plant and material in question. You can do this by checking the relevant production orders, stock levels, or MRP runs.
- Release or Change Allocation: If the plant is allocated to another order that is no longer needed, consider releasing it or changing the allocation to a different plant if possible.
- Review Configuration: Check the configuration settings in the SAP system related to plant allocation and MRP settings to ensure they are set up correctly.
- Data Consistency Check: Run data consistency checks to identify any discrepancies in the master data or transaction data that may be causing the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the MD120 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
MD119
Please adjust dates for the independent requirements versions
What causes this issue? You changed the planning period of the scenario so that the validity period of one or more planned independent requirements v...
MD118
Date & lies outside the planning period
What causes this issue? You entered a start or finish date for the versions to be used that lies outside the period of the scenario that you defined....
MD121
You have not yet allocated any planned indep.reqmts versions
What causes this issue? To carry out long-term planning with a planning scenario, you must determine which independent requirements versions are to b...
MD122
You have not yet allocated any plants
What causes this issue? To carry out long-term planning, you use the scenario to control which plants are included in the planning run.System Respons...
Click on this link to search all SAP messages.