How To Fix MD119 - Please adjust dates for the independent requirements versions


MD119 - Overview

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 119

  • Message text: Please adjust dates for the independent requirements versions

  • Show details Hide details
  • What causes this issue?

    You changed the planning period of the scenario so that the validity
    period of one or more planned independent requirements versions no
    longer lies within the planning period.

    System Response

    If you have maintained the validity periods for the planned independent
    requirements, the system checks whether they lie within the planning
    period for the scenario.

    How to fix this error?

    Adjust the validity periods of the versions to suit the planning
    period.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MD119 - Please adjust dates for the independent requirements versions ?
    The SAP error message MD119, which states "Please adjust dates for the independent requirements versions," typically occurs in the context of Material Requirements Planning (MRP) when there is a mismatch or inconsistency in the dates of independent requirements (such as sales forecasts or planned independent requirements) for a material.
    
    Cause: Date Mismatch: The independent requirements for a material may have been defined with dates that do not align with the planning horizon or the current date settings in the system. Versioning Issues: If multiple versions of independent requirements exist, there may be inconsistencies in the dates across these versions. Planning Parameters: The planning parameters set for the material may not be configured correctly, leading to conflicts in the date settings. Data Entry Errors: Manual entry errors when creating or modifying independent requirements can lead to incorrect date settings.
    Solution: Check Independent Requirements: Go to the transaction code MD61 (Create Independent Requirements) or MD62 (Change Independent Requirements) and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author