Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 123
Message text: Planning scenario & was released and saved
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD123
- Planning scenario & was released and saved ?The SAP error message MD123 typically indicates that there is an issue with the planning scenario in the context of SAP's Advanced Planning and Optimization (APO) module. The message usually states that the planning scenario has been released and saved, but there may be issues related to the configuration or data integrity.
Cause:
- Planning Scenario Configuration: The planning scenario may not be properly configured or may have missing components.
- Data Integrity Issues: There could be inconsistencies or missing data in the master data or transaction data that the planning scenario relies on.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the planning scenario.
- Versioning Issues: The planning version may not be correctly set or may be locked by another user or process.
- Release Status: The planning scenario might be in a state that does not allow further changes or processing.
Solution:
- Check Configuration: Review the configuration of the planning scenario to ensure that all necessary components are correctly set up.
- Data Validation: Validate the master data and transaction data to ensure that there are no inconsistencies or missing entries.
- Authorization Check: Ensure that the user has the appropriate authorizations to work with the planning scenario.
- Version Management: Check the versioning of the planning scenario to ensure it is not locked and is set to the correct version for processing.
- Release Status: If the scenario is released, consider whether it needs to be retracted or if a new version should be created for further changes.
Related Information:
/SAPAPO/SDP94
for planning book and /SAPAPO/MC90
for planning scenario maintenance.By following these steps, you should be able to identify and resolve the underlying issues causing the MD123 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
MD122
You have not yet allocated any plants
What causes this issue? To carry out long-term planning, you use the scenario to control which plants are included in the planning run.System Respons...
MD121
You have not yet allocated any planned indep.reqmts versions
What causes this issue? To carry out long-term planning with a planning scenario, you must determine which independent requirements versions are to b...
MD124
Version & of the purchasing info system is already being used
What causes this issue? Version &V1& of the purchasing info system already exists.System Response The results of the planning scenario can b...
MD125
Planning version & has already been allocated to the scenario
What causes this issue? A planning version was allocated to the scenario in the last data transfer. Therefore, it is not possible to allocate another...
Click on this link to search all SAP messages.