How To Fix MA367 - Job not/incorrectly scheduled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MA - Sales and Operations Planning

  • Message number: 367

  • Message text: Job not/incorrectly scheduled

  • Show details Hide details
  • What causes this issue?

    A job has been defined, but it has not been (correctly) scheduled.

    System Response

    The job cannot be carried out.

    How to fix this error?

    Schedule the job correctly by calling up job processing for mass
    processing.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MA367 - Job not/incorrectly scheduled ?

    The SAP error message MA367 ("Job not/incorrectly scheduled") typically occurs in the context of Material Requirements Planning (MRP) or production planning when there is an issue with the scheduling of jobs in the system. This error can arise due to various reasons, and understanding the cause is essential for finding an appropriate solution.

    Causes of MA367 Error

    1. Incorrect Job Scheduling: The job may not have been scheduled correctly in the system, leading to discrepancies in the planning process.

    2. Missing or Incorrect Parameters: The scheduling parameters (like lead times, production versions, etc.) may be missing or incorrectly defined in the material master or production order.

    3. Capacity Constraints: If there are capacity constraints in the work center, the system may not be able to schedule the job as planned.

    4. Resource Availability: The required resources (machines, labor, etc.) may not be available at the time the job is scheduled.

    5. Configuration Issues: There may be configuration issues in the MRP settings or production planning settings that prevent proper scheduling.

    6. Data Inconsistencies: Inconsistencies in master data (like BOM, routing, etc.) can lead to scheduling errors.

    Solutions to MA367 Error

    1. Check Job Scheduling: Review the job scheduling details in the system. Ensure that the job is scheduled correctly and that all necessary parameters are set.

    2. Review Material Master Data: Check the material master data for the relevant materials. Ensure that all necessary fields, such as lead times and production versions, are correctly filled out.

    3. Analyze Capacity Planning: Look into the capacity planning for the work centers involved. Ensure that there are no capacity constraints that would prevent the job from being scheduled.

    4. Verify Resource Availability: Check the availability of resources required for the job. If resources are not available, consider rescheduling the job or adjusting the resource allocation.

    5. Configuration Review: Review the configuration settings in the MRP and production planning modules. Ensure that all settings are correctly defined and aligned with business processes.

    6. Data Consistency Check: Perform a consistency check on the master data, including BOMs and routings, to ensure there are no discrepancies that could affect scheduling.

    7. Use Transaction Codes: Utilize relevant transaction codes (like MD04 for stock/requirements list, CO02 for production order, etc.) to analyze the situation further and gather more information.

    8. Consult SAP Notes: Check for any relevant SAP Notes or documentation that may address this specific error message or provide additional troubleshooting steps.

    Related Information

    • Transaction Codes: Familiarize yourself with transaction codes related to MRP and production planning, such as MD01 (MRP Run), CO01 (Create Production Order), and CO02 (Change Production Order).

    • SAP Help Documentation: Refer to SAP's official help documentation for detailed explanations of MRP and production scheduling processes.

    • User Forums and Communities: Engage with SAP user communities and forums for shared experiences and solutions from other users who may have encountered the same error.

    By systematically addressing the potential causes and applying the suggested solutions, you should be able to resolve the MA367 error and ensure proper job scheduling in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant