Message type: E = Error
Message class: M3 - Material Master
Message number: 768
Message text: Special procurement type for costing will be reset
You are trying to enter the special procurement type for phantom
assemblies in the Costing view, which you want to override the special
procurement type in the MRP view when the material is costed. This
entry is not possible in the Costing view.
The system resets (that is, cancels) the special procurement type for
phantom assemblies in the Costing view.
Check your entry.
If you want to cost the material as a phantom assembly, enter
special procurement type <LB>50</> in the MRP view and leave the
special procurement type blank in the Costing view.
If you then cost the material, the system determines the planned costs
of the BOM components in the phantom assembly.
Error message extract from SAP system. Copyright SAP SE.
M3768
- Special procurement type for costing will be reset ?The SAP error message M3768 ("Special procurement type for costing will be reset") typically occurs in the context of material master data and is related to the configuration of special procurement types in the Material Management (MM) module. This error indicates that the system has detected an inconsistency or issue with the special procurement type assigned to a material for costing purposes.
Cause: Inconsistent Special Procurement Type: The special procurement type assigned to the material may not be valid for the costing view or may not be compatible with the current configuration. Missing Configuration: The special procurement type may not be properly configured in the system, leading to the reset of the procurement type during the costing process. Material Master Data Issues: There may be issues with the material master data itself, such as missing or incorrect entries in the costing view. Costing Variant Settings: The costing variant used may not support the special procurement
Get instant SAP help. Sign up for our Free Essentials Plan.
M3767
Important: the date of production must be entered in the goods receipt
What causes this issue? If a total shelf life is entered in the material master record, the system will assume that the date entered in the goods rec...
M3766
Enter a valid percentage rate
What causes this issue? You have entered a storage percentage that is greater than 100 per cent.System Response This is not allowed.How to fix this ...
M3769
Roll forward period for planning will be reset
What causes this issue? You have entered a roll forward period for planned independent requirements, but no consumption mode.System Response Since i...
M3770
Stocks at higher levels will also be displayed
What causes this issue? You have selected a display level so that the stocks at that level are included in the <DS:GLOS.3526C05AAFAB52B9E10000009B...
Click on this link to search all SAP messages.