Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 769
Message text: Roll forward period for planning will be reset
You have entered a roll forward period for planned independent
requirements, but no consumption mode.
Since it only makes sense to specify a roll forward period with
consumption, your entry is cancelled by the system.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
M3769
- Roll forward period for planning will be reset ?The SAP error message M3769, which states "Roll forward period for planning will be reset," typically occurs in the context of Material Requirements Planning (MRP) or other planning processes in SAP. This message indicates that the roll forward period for planning is being reset, which can affect how planning data is processed.
Cause:
The error can be caused by several factors, including:
- Configuration Issues: The planning parameters may not be set correctly in the system, leading to inconsistencies in the roll forward period.
- Master Data Changes: Changes in material master data, such as the planning strategy or MRP type, can trigger this message.
- Planning Run Settings: The settings used during the planning run may not align with the current configuration or master data.
- Version Management: If there are multiple planning versions, the system may reset the roll forward period when switching between versions.
Solution:
To resolve the M3769 error, consider the following steps:
Check Configuration:
- Review the planning parameters in the configuration settings (transaction code SPRO).
- Ensure that the roll forward period is set correctly for the relevant planning area.
Review Master Data:
- Check the material master data for the affected materials (transaction code MM03).
- Ensure that the planning strategy, MRP type, and other relevant fields are correctly configured.
Adjust Planning Run Settings:
- When executing the planning run (transaction code MD01 or MD02), verify that the settings align with the current configuration.
- Ensure that the planning horizon and roll forward period are set appropriately.
Check Version Management:
- If using multiple planning versions, ensure that the correct version is selected and that it is configured properly.
Consult Documentation:
- Refer to SAP documentation or notes related to MRP and planning to understand any specific requirements or known issues.
Testing:
- After making changes, perform a test planning run to verify that the error does not reoccur.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
M3768
Special procurement type for costing will be reset
What causes this issue? You are trying to enter the special procurement type for phantom assemblies in the Costing view, which you want to override t...
M3767
Important: the date of production must be entered in the goods receipt
What causes this issue? If a total shelf life is entered in the material master record, the system will assume that the date entered in the goods rec...
M3770
Stocks at higher levels will also be displayed
What causes this issue? You have selected a display level so that the stocks at that level are included in the <DS:GLOS.3526C05AAFAB52B9E10000009B...
M3771
Position the cursor on a stock line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.