How To Fix KZ056 - Cost object & is already marked as top node of hierarchy (*)


KZ056 - Overview

  • Message type: E = Error

  • Message class: KZ - Cost Object Repetitive Mfg / Process Mfg

  • Message number: 056

  • Message text: Cost object & is already marked as top node of hierarchy (*)

  • Show details Hide details
  • What causes this issue?

    The cost object ID is already defined as the highest level in
    the cost object hierarchy when '*' was entered in the "Higher-level
    cost object" field.

    Error message extract from SAP system. Copyright SAP SE.


KZ056 - Details

  • The SAP error message KZ056 indicates that a cost object (such as a cost center, internal order, or project) is already marked as the top node of a hierarchy. This typically occurs in the context of controlling (CO) modules when you are trying to assign a cost object to a hierarchy that already has a designated top node.
    
    Cause: Duplicate Assignment: The cost object you are trying to assign is already set as the top node in another hierarchy. Hierarchy Structure: The structure of the hierarchy does not allow for multiple top nodes. Each hierarchy can only have one top node. Incorrect Configuration: There may be a configuration issue in the hierarchy settings that is causing this error.
    Solution: Check Existing Hierarchies: Review the existing hierarchies to see if the cost object is already assigned as a top node. You can do this by navigating to the hierarchy management in the SAP CO module. Change Top Node:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KZ056 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker