How To Fix KZ056 - Cost object & is already marked as top node of hierarchy (*)


KZ056 - Overview

  • Message type: E = Error

  • Message class: KZ - Cost Object Repetitive Mfg / Process Mfg

  • Message number: 056

  • Message text: Cost object & is already marked as top node of hierarchy (*)

  • Show details Hide details
  • What causes this issue?

    The cost object ID is already defined as the highest level in
    the cost object hierarchy when '*' was entered in the "Higher-level
    cost object" field.

    Error message extract from SAP system. Copyright SAP SE.


KZ056 - Details

  • The SAP error message KZ056 indicates that a cost object (such as a cost center, internal order, or project) is already marked as the top node of a hierarchy. This typically occurs in the context of controlling (CO) modules when you are trying to assign a cost object to a hierarchy that already has a designated top node.
    
    Cause: Duplicate Assignment: The cost object you are trying to assign is already set as the top node in another hierarchy. Hierarchy Structure: The structure of the hierarchy does not allow for multiple top nodes. Each hierarchy can only have one top node. Incorrect Configuration: There may be a configuration issue in the hierarchy settings that is causing this error.
    Solution: Check Existing Hierarchies: Review the existing hierarchies to see if the cost object is already assigned as a top node. You can do this by navigating to the hierarchy management in the SAP CO module. Change Top Node:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KZ056 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant