Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 046
Message text: No activity qty. allocation planned for business process &
Business process &v1& is not intended for quantity allocation because
the allocation type is not maintained.
The business process cannot take part in the quantity allocation.
If necessary, check the allocation definition of the business process
in the master record maintenance.
Error message extract from SAP system. Copyright SAP SE.
KW046
- No activity qty. allocation planned for business process & ?The SAP error message KW046 ("No activity qty. allocation planned for business process &") typically occurs in the context of controlling and activity allocation within SAP. This error indicates that there is no planned quantity for activity allocation in the specified business process. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Missing Planning Data: The most common cause is that the activity type or business process does not have any planned quantities defined in the planning version.
- Incorrect Configuration: The configuration for the activity type or the business process may not be set up correctly.
- Period Not Open: The period for which you are trying to allocate activities may not be open for posting.
- Master Data Issues: There may be issues with the master data related to the cost center, activity type, or business process.
Solutions:
Check Planning Data:
- Go to the planning transaction (e.g., KP06 for cost center planning) and verify that there are planned quantities for the relevant activity type and business process.
- If there are no planned quantities, you will need to enter them.
Review Configuration:
- Ensure that the activity type is correctly configured in the controlling area.
- Check the settings for the business process to ensure it is correctly linked to the activity type.
Open Periods:
- Verify that the period you are trying to post to is open. You can check this in the period closing settings in the controlling module.
Master Data Verification:
- Check the master data for the cost center and activity type to ensure they are correctly set up and active.
- Ensure that the business process is correctly defined and linked to the relevant cost center and activity type.
Replan if Necessary:
- If you find that the planned quantities are missing, you may need to replan the activity quantities for the relevant period.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) to further diagnose the problem.
Get instant SAP help. Start your 7-day free trial now.
KW045
Business process &1 is in area &2, but the master data record shows &3
What causes this issue? An inconsistency has been identified: The standard hierarchy assigns the business process &v1& to area &v2&, ...
KW044
Area &1 is not allowed because business process &2 is in &3
What causes this issue? A new existence interval for business process &v2& should already be present in hierachy area &v1&. The busin...
KW047
The system was unable to select all the business processes.
What causes this issue? You wish to change a quantity of business processes, but are unable to because a current lock does not allow you to choose al...
KW048
Also maintain the process driver for quantity allocations
What causes this issue? You have maintained default values for the allocation; namely, the allocation type.System Response The system suggests that ...