Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 254
Message text: The planned quantity is in the future
The planned quantity specified in the <LS>manufacturing order</> is
assigned to a later period than that specified in <LS>variance
calculation</>.
In make-to-order environments, check the period specified in variance
calculation.
Example:
In a manufacturing order, the planned quantity and the planned costs
were for the period 10/2000, but in variance calculation the period
specifed was 9/2000.
Variances are calculated if the message type is not <ZH>E</> (error).
The message type can be changed with the user-defined error management
functions.
If you do not want to calculate variances, set the message type in
user-defined error management to <ZH>E</> (error).
Note the following:
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In the standard system (without the Schedule Manager), the setting inError message extract from SAP system. Copyright SAP SE.
KV254
- The planned quantity is in the future ?The SAP error message KV254, which states "The planned quantity is in the future," typically occurs in the context of production planning or material requirements planning (MRP) when a planned order or production order is scheduled for a date that is beyond the current date. This can happen in various scenarios, such as when trying to create or adjust a production order, or when running MRP.
Cause:
- Future Date in Planning: The planned order or production order is set for a date that is beyond the current date, which is not allowed in certain configurations or processes.
- Incorrect Planning Parameters: The planning parameters or settings in the material master or production scheduling profile may not allow for future planning.
- System Configuration: The system may be configured to restrict planning to the current date or a specific time frame.
Solution:
- Check Planned Order Dates: Review the planned order or production order dates to ensure they are set correctly. Adjust the dates to be within the acceptable range.
- Adjust Planning Parameters: If the planning parameters in the material master or production scheduling profile are too restrictive, consider adjusting them to allow for future planning.
- Review MRP Settings: Check the MRP settings in the configuration to ensure that future planning is allowed. This may involve reviewing the planning horizon settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
- User Authorization: Ensure that the user has the necessary authorizations to create or modify planned orders.
Related Information:
By following these steps, you should be able to resolve the KV254 error and continue with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
KV253
The order has the status "Error in cost calculation"
What causes this issue? You are attempting to determine variances for which the <DS:GLOS.36D13DE53BCC454DE10000009B38F983>control costs</>...
KV252
Choose a maximum of 5 target cost versions
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV255
No costing variant for planned costs in order
What causes this issue? The system could not find a costing variant for the planned costs for the order, so it was not possible to calculate the orde...
KV400
************** Variances: Cost Objects (401-599) ************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.