How To Fix KV222 - Leading order & is assigned to project &


KV222 - Overview

  • Message type: E = Error

  • Message class: KV - Variance Analysis for Cost Centers and Cost Objects

  • Message number: 222

  • Message text: Leading order & is assigned to project &

  • Show details Hide details
  • What causes this issue?

    You are attempting to calculate variances for an order that is part of
    collective order &V1&.
    This collective order was created in engineer-to-order. This means
    that:
    Its costs are included in <DS:GLOS.results_analysis>results analysis</>
    for the leading order &V1&
    The total costs and the revenues (not the variances) are settled to
    Profitability Analysis
    For this reason no variances are calculated for this order.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KV222 - Leading order & is assigned to project & ?
    The SAP error message KV222 typically indicates that there is an issue with the assignment of a leading order to a project. This error can occur in the context of controlling and project management within SAP, particularly when dealing with internal orders, projects, and their associated costs.
    Cause of Error KV222
    The error message KV222 usually arises due to one of the following reasons:
    
    
    Incorrect Assignment: The leading order is not correctly assigned to the project. This can happen if the order is not set up properly or if there are inconsistencies in the assignment.
    
    
    Missing Configuration: The project or order may not be configured correctly in the system, leading to issues when trying to assign them.
    
    
    Authorization Issues: The user may not have the necessary authorizations to view or modify the leading order or project.
    
    
    Data Inconsistencies: There may be inconsistencies in the master data related to the project or order, such as missing or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant