How To Fix KV172 - No cost estimate exists for sales order & &


KV172 - Overview

  • Message type: E = Error

  • Message class: KV - Variance Analysis for Cost Centers and Cost Objects

  • Message number: 172

  • Message text: No cost estimate exists for sales order & &

  • Show details Hide details
  • What causes this issue?

    The system is attempting to determine the target costs on the basis of a
    sales order cost estimate.
    If you are using a valuated sales order stock, you can do the following
    on the basis of these target costs:
    Valuate work in process (WIP) at target costs
    Valuate confirmed scrap quantities
    Determine variances between the target costs and the actual costs
    In the WIP calculation process, the system then attempts to valuate the
    work in process on the basis of a sales order cost estimate if you have
    specified in the <LS>valuation variant for work in process and scrap</>
    that valuation should be made on the basis of the current standard cost
    estimate and if a valuation strategy is defined in the requirements
    class that causes the standard price of the valuated sales order stock
    to be determined on the basis of the sales order cost estimate.
    When it calculates the variances, the system attempts to valuate the
    confirmed scrap quantities on the basis of a sales order cost estimate
    if you have specified in the <LS>valuation variant for work in process
    and scrap</> that the valuation should be made on the basis of the
    current standard cost estimate and if a valuation strategy is defined in
    the requirements class that causes the standard price of the valuated
    sales order stock to be calculated on the basis of the sales order cost
    estimate. Another requirement is that the <LS>Scrap</> indicator be set
    in the variance key.
    When it calculates the variances, the system attempts to valuate the
    total variance on the basis of the sales order cost estimate if it has
    been specified in the target cost version that the target costs are to
    be calculated on the basis of a current standard cost estimate and if a
    valuation strategy has been defined in the requirements class that
    causes the standard price of the valuated sales order stock to be
    calculated on the basis of the sales order cost estimate.
    The system cannot find a sales order cost estimate for the sales order.
    This could be caused by any of the following reasons:
    The cost estimate does not exist.
    The cost estimate is not valid on the appropriate date.
    Work in process and variances are calculated by period. The cost
    estimate must be valid on the last day of the period.
    The cost estimate does not have an itemization.
    Note that you can only valuate work in process and scrap at target costs
    using a product cost estimate with quantity structure. A unit cost
    estimate cannot be used to valuate work in process and scrap.

    System Response

    The system cannot calculate any target costs.

    How to fix this error?

    Check the following in Customizing:
    The valuation variant for work in process and scrap
    The target cost version
    The requirements class
    If necessary, change the settings in these Customizing steps, or create
    a preliminary cost estimate for the sales order item.
    For information on the calculation of standard prices with a valuated
    sales order stock, see the documentation <LS>Cost Object Controlling ->
    Product Cost by Sales Order</>.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KV172 - No cost estimate exists for sales order & & ?
    The SAP error message KV172 "No cost estimate exists for sales order & &" typically occurs when you are trying to perform a transaction related to a sales order, but the system cannot find a cost estimate associated with that sales order. This can happen for several reasons, and here are some common causes, solutions, and related information:
    Causes:
    
    Missing Cost Estimate: The most straightforward reason is that a cost estimate has not been created for the sales order item.
    Incorrect Sales Order Status: The sales order may be in a status that does not allow for cost estimates to be generated or accessed.
    
    Configuration Issues: There may be configuration issues in the costing variant or the valuation class that prevent the cost estimate from being generated. Master Data Issues: The material master or the BOM (Bill of Materials) may not be set up correctly, leading to the inability to generate a cost estimate. Costing Run

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker