Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 170
Message text: Cost est. does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & &
You are using a function that calculates target costs using the
preliminary cost estimate for the product cost collector (meaning on the
basis of planned costs). On the basis of this information, the system
can:
Calculate work in process (WIP)
Calculate the value of the unplanned scrap in variance calculation
Calculate production variances and display them subdivided into variance
categories
For material &v2&
No repetitive manufacturing profile has been maintained in the material
master record
No product cost collector for production version&v3& has been created
In the product cost collector you have
Not specified a production version
Not specified a costing variant for preliminary costing
The cost estimate for material &v2& is
Missing
Was not created with costing variant &v1&
Was not created with production version &v3& or was not linked to it
Not valid on &v4&
Not saved as an itemization
Not valid at the time WIP or variances were calculated
Work in process and variances for product cost collectors are calculated
separately in each period. The cost estimate must be valid on the last
day of the period.
If target costs are calculated directly in a report, the cost estimate
must be valid on the last day of the reporting timeframe.
The absence of target costs has the following effects:
The system cannot display a report on the target costs
The system cannot valuate the work in process
The system cannot valuate the scrap
In variance calculation, the system cannot split the difference between
the target costs and the actual costs into variance categories.
The difference is updated as a remaining variance.
For the valuation of work in process and scrap at target costs
calculated on the basis of planned costs, check the <LS>valuation
variant for work in process and scrap</>.
Proceed as follows:
Check the validity dates of the cost estimate.
<DS:TRAN.CK13N>Proceed</>
Create a new cost estimate for the material, and save the cost estimate
in itemized form by turning on the <LS>Itemization</> field in the <LS>
Update parameters</> dialog box.
<DS:TRAN.MF30>Proceed</>
Calculate the WIP or variances again.
If you are working in reporting, select a report that does not refer to
the target costs.
Error message extract from SAP system. Copyright SAP SE.
KV170
- Cost est. does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & & ?The SAP error message KV170, which states "Cost estimate does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & &," typically occurs when the system is unable to find a cost estimate for a specific material, plant, production version, cost variant, and date combination. This can happen in various scenarios, such as during the creation of a production order, when trying to perform a cost analysis, or when executing a transaction that requires cost data. Causes: Missing Cost Estimate: The most common cause is that a cost estimate has not been created for the specified material, plant, production version, and cost variant. Incorrect Date: The date specified may not fall within the validity period of the cost estimate. Incorrect Configuration: The configuration settings for cost estimation may not be set up correctly. Material Not Maintained: The material may not be maintained in the system for the specified plant or production version. Costing Variant Issues: The costing variant used may
Get instant SAP help. Sign up for our Free Essentials Plan.
KV169
No target costs because no price for material & & in currency &
What causes this issue? Because the company code currency is not the same as the controlling area currency, the system is attempting to calculate <...
KV168
No operations found
What causes this issue? An internal system error occurred.System Response The system issues an error message and will not allow you to continue with...
KV171
No cost estimate. Mat./Plant/CostVers/CostVar/Date: & & & &
What causes this issue? The system is attempting to calculate target costs for the following purposes: To valuate work in process To valuate unplanne...
KV172
No cost estimate exists for sales order & &
What causes this issue? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are using a valuat...