How To Fix KV169 - No target costs because no price for material & & in currency &


KV169 - Overview

  • Message type: E = Error

  • Message class: KV - Variance Analysis for Cost Centers and Cost Objects

  • Message number: 169

  • Message text: No target costs because no price for material & & in currency &

  • Show details Hide details
  • What causes this issue?

    Because the company code currency is not the same as the controlling
    area currency, the system is attempting to calculate
    <DS:GLOS.target_costs>target costs</> in both currencies.
    However, the <DS:GLOS.cost_component>cost components</> for the
    relevant cost estimate only exist in one currency. The relevant cost
    estimate can be one of the following:
    The current <DS:GLOS.standard_cost_estimate>standard cost estimate</>
    for the material being manufactured
    The alternative <DS:GLOS.3526B72BAFAB52B9E10000009B38F974>material cost
    estimate</> (such as a
    <DS:GLOS.3526B75EAFAB52B9E10000009B38F974>modified standard cost
    estimate</> or <DS:GLOS.3526B71CAFAB52B9E10000009B38F974>current cost
    estimate</>)
    The <DS:GLOS.3526B6D1AFAB52B9E10000009B38F974>sales order cost
    estimate</>

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    For the next relevant cost estimate, you can ensure that a
    <DS:GLOS.cost_component_split>cost component split</> is generated in
    the second currency by activating the
    <DS:GLOS.3526B6C3AFAB52B9E10000009B38F974>cost component split</> in
    controlling area currency. You do this in Customizing for Product Cost
    Planning

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KV169 - No target costs because no price for material & & in currency & ?
    The SAP error message KV169 indicates that there are no target costs available for a specific material in a given currency. This typically occurs in the context of cost planning or product costing when the system is unable to find a valid price for the specified material.
    
    Cause: Missing Price Data: The most common cause is that the material does not have a valid price maintained in the system. This could be due to: The material master record not being updated with the necessary pricing information. The price not being set for the relevant valuation area or currency. Incorrect Configuration: There may be issues with the configuration of the costing variant or the valuation method being used. Material Status: The material might be blocked or inactive, preventing it from being used in costing. Currency Issues: The currency specified in the error message may not be set up correctly in the system for the material.
    Solution: Check Material Master: Go to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author