Do you have any question about this error?
Message type: E = Error
Message class: KQ - Error Messages for Customizing Product Costing
Message number: 231
Message text: Enter costing variant for alternative material cost estimate
You are defining a <DS:GLOS.target_cost_version>target cost version</>
that calculates the <DS:GLOS.target_costs>target costs</> for the
material being manufactured using an alternative
<DS:GLOS.material_cost_estimate>material cost estimate</> (such as a
<DS:GLOS.modified_standard_cost_estimate>modified standard cost
estimate</>).
The system can only select this cost estimate for
<DS:GLOS.variance_calculation>variance calculation</> if it knows which
<DS:GLOS.costing_variant>costing variant</> was used to create the
modified standard cost estimate.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter the appropriate costing variant.
Error message extract from SAP system. Copyright SAP SE.
KQ231
- Enter costing variant for alternative material cost estimate ?The SAP error message KQ231, which states "Enter costing variant for alternative material cost estimate," typically occurs when you are trying to perform a cost estimate for a material but have not specified a costing variant. This can happen in various transactions related to material costing, such as when creating or changing a cost estimate.
Cause:
The error is caused by the absence of a costing variant in the cost estimate process. A costing variant is essential as it defines how the cost estimate is calculated, including the parameters and methods used for valuation.
Solution:
To resolve this error, you need to specify a costing variant in the relevant transaction. Here are the steps to do so:
Access the Cost Estimate Transaction:
- Go to the transaction where you encountered the error (e.g., CK11N for creating a cost estimate).
Enter the Material and Plant:
- Input the material number and the plant for which you want to create the cost estimate.
Specify the Costing Variant:
- Look for the field labeled "Costing Variant" or similar. Enter the appropriate costing variant that you want to use for the cost estimate. If you are unsure which costing variant to use, you may need to consult with your finance or controlling team.
Check Configuration:
- If you do not have a costing variant available, you may need to configure one. This can be done in the following way:
- Go to the transaction code OKKN (Define Costing Variants).
- Create or modify a costing variant as per your requirements.
Save and Execute:
- After entering the costing variant, save your entries and try executing the cost estimate again.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) or material management (MM) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KQ230
Target costs are necessary for cost split
What causes this issue? In the cost object category for <DS:GLOS.cost_object_hierarchy>cost object hierarchies</>, you specified that the...
KQ229
Target costs needed for calculation of scrap or variances
What causes this issue? You specified that you want to calculate variances or scrap for this <DS:GLOS.variance_key>variance key</>. The s...
KQ232
Only comparison version 0 allowed for version 0
What causes this issue? <DS:GLOS.target_cost_version>Target cost version</> 0 is relevant for settlement. This means that only the standa...
KQ233
Target cost version also used for cost centers or cost objects
What causes this issue? You are processing a <DS:GLOS.target_cost_version>target cost version</> for the calculation of production varian...
Click on this link to search all SAP messages.