In the cost object category for <DS:GLOS.cost_object_hierarchy>cost
object hierarchies</>, you specified that the actual costs collected at
a higher level are to be apportioned to the materials. These costs are
apportioned on the basis of the target costs for each material.
Target costs are only calculated if the <LS>Target costs</> indicator
is set in the relevant variance key.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entries.
Error message extract from SAP system. Copyright SAP SE.
KQ230
- Target costs are necessary for cost split ?The SAP error message KQ230, which states "Target costs are necessary for cost split," typically occurs in the context of controlling and cost accounting within SAP. This error indicates that the system requires target costs to be defined for a cost split operation, which is often related to internal orders, cost centers, or production orders.
Cause:
- Missing Target Costs: The primary cause of this error is that the target costs for the relevant cost object (e.g., internal order, cost center, or production order) have not been defined or are not available in the system.
- Cost Split Configuration: The configuration for cost splitting may not be set up correctly, or the necessary parameters for the cost split process are missing.
- Incorrect Master Data: The master data for the cost object may be incomplete or incorrectly maintained, leading to the absence of target costs.
Solution:
Define Target Costs:
- Navigate to the relevant cost object (e.g., internal order, cost center, or production order) and ensure that target costs are defined.
- You can do this by accessing the appropriate transaction (e.g., KO02 for internal orders) and entering the necessary target cost information.
Check Cost Split Configuration:
- Review the configuration settings for cost splitting in the controlling module. Ensure that all necessary parameters are correctly set up.
- You may need to consult with your SAP configuration team or refer to the SAP documentation for guidance on setting up cost splits.
Review Master Data:
- Check the master data for the cost object to ensure that all required fields are filled out correctly, including any relevant cost elements and cost centers.
- Make sure that the cost object is active and properly assigned to the relevant controlling area.
Consult SAP Notes:
- Look for any relevant SAP Notes that may address this specific error message. SAP frequently releases updates and patches that may resolve known issues.
Testing:
- After making the necessary changes, perform a test to ensure that the error no longer occurs and that the cost split can be executed successfully.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP Controlling (CO) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KQ229
Target costs needed for calculation of scrap or variances
What causes this issue? You specified that you want to calculate variances or scrap for this <DS:GLOS.variance_key>variance key</>. The s...
KQ228
Cost object hierarchy only allows periodic variance calculation
What causes this issue? You created a <DS:GLOS.variance_key>variance key</> for a <DS:GLOS.cost_object_hierarchy>cost object hierar...
KQ231
Enter costing variant for alternative material cost estimate
What causes this issue? You are defining a <DS:GLOS.target_cost_version>target cost version</> that calculates the <DS:GLOS.target_cos...
KQ232
Only comparison version 0 allowed for version 0
What causes this issue? <DS:GLOS.target_cost_version>Target cost version</> 0 is relevant for settlement. This means that only the standa...