How To Fix KPT3040 - Projection period &1 not within template period interval &2 - &3


KPT3040 - Overview

  • Message type: E = Error

  • Message class: KPT3 - Messages for Plan->Plan or Actual->Plan

  • Message number: 040

  • Message text: Projection period &1 not within template period interval &2 - &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KPT3040 - Projection period &1 not within template period interval &2 - &3 ?
    The SAP error message KPT3040 indicates that there is a mismatch between the projection period you are trying to use and the defined template period interval. This error typically occurs in the context of planning and budgeting processes within SAP, particularly when using the SAP Controlling (CO) module.
    
    Cause: The error message KPT3040 is triggered when: The projection period (e.g., a specific month or quarter) you are trying to use falls outside the range of the template period defined in your planning template. The template period interval is defined with a start date and an end date, and your selected projection period does not fall within this range.
    Solution: To resolve this error, you can take the following steps: Check the Template Settings: Go to the planning template settings in SAP and verify the defined period interval. Ensure that the start and end dates of the template cover the projection period you are trying to use. Adjust the Projection

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker