How To Fix KPN091 - Calculation dates are not current


KPN091 - Overview

  • Message type: E = Error

  • Message class: KPN - Costing: Networks, Projects

  • Message number: 091

  • Message text: Calculation dates are not current

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


KPN091 - Details

  • The SAP error message KPN091, which states "Calculation dates are not current," typically occurs in the context of cost planning or cost center accounting. This error indicates that the dates used for the calculation of costs or planning data are not aligned with the current date or the expected date range for the planning process.
    Causes:
    
    Outdated Planning Data: The planning data may have been created or modified with dates that are no longer valid or relevant.
    Incorrect Date Settings: The system may be configured with incorrect date settings, leading to discrepancies between the current date and the planning dates.
    Period Closure: The financial period may have been closed, preventing any changes or calculations for that period.
    Master Data Issues: There may be issues with the master data related to cost centers, profit centers, or other relevant entities that affect the planning process.
    
    Solutions:
    
    Check Planning Data: Review the planning data to ensure that the calculation dates

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KPN091 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker