How To Fix KPN053 - Valuation for material &1 has already been made in the operative project


KPN053 - Overview

  • Message type: E = Error

  • Message class: KPN - Costing: Networks, Projects

  • Message number: 053

  • Message text: Valuation for material &1 has already been made in the operative project

  • Show details Hide details
  • What causes this issue?

    Material &V1& for WBS element &V2& has been valued in the operative
    project due to a goods receipt. If you transfer the project simulation
    back to the operative project, the system uses the price determined in
    the material valuation for the network costing.

    System Response

    Variances may occure between the network costing in the operative
    project and the network costing in the simulation version.

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KPN053 - Valuation for material &1 has already been made in the operative project ?
    The SAP error message KPN053 indicates that a valuation for a specific material has already been made in the operative project. This typically occurs in the context of project systems (PS) or controlling (CO) modules when trying to perform a valuation or posting that conflicts with an existing valuation.
    
    Cause: Duplicate Valuation: The error arises when there is an attempt to perform a valuation for a material that has already been valued in the project. This can happen if: The same material is being processed multiple times. There are inconsistencies in the project data or configuration. The valuation is being attempted in a different context or phase of the project. Project Status: The project might be in a status that does not allow for further valuations or changes. Material Master Data: Issues with the material master data, such as incorrect settings or missing information, can also lead to this error.
    Solution: Check Existing Valuations: Review the project and check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker