Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 053
Message text: Valuation for material &1 has already been made in the operative project
Material &V1& for WBS element &V2& has been valued in the operative
project due to a goods receipt. If you transfer the project simulation
back to the operative project, the system uses the price determined in
the material valuation for the network costing.
Variances may occure between the network costing in the operative
project and the network costing in the simulation version.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KPN053
- Valuation for material &1 has already been made in the operative project ?The SAP error message KPN053 indicates that a valuation for a specific material has already been made in the operative project. This typically occurs in the context of project systems (PS) or controlling (CO) modules when trying to perform a valuation or posting that conflicts with an existing valuation.
Cause: Duplicate Valuation: The error arises when there is an attempt to perform a valuation for a material that has already been valued in the project. This can happen if: The same material is being processed multiple times. There are inconsistencies in the project data or configuration. The valuation is being attempted in a different context or phase of the project. Project Status: The project might be in a status that does not allow for further valuations or changes. Material Master Data: Issues with the material master data, such as incorrect settings or missing information, can also lead to this error.
Solution: Check Existing Valuations: Review the project and check
Get instant SAP help. Sign up for our Free Essentials Plan.
KPN052
Material &1 for WBS element &2 has already been valuated
What causes this issue? Material &V1& has already been valued due to goods being received into stock in WBS element &V2&.System Respo...
KPN051
Adapt invoicing plan for material component
What causes this issue? You have used a unit costing to recalculate the price of the material component. An invoicing plan with partial invoicing by ...
KPN054
A costing for material &2 has already been maintained re WBS el. &1
What causes this issue? The materials in valuated project stock are valued at the level of the WBS element, material, and plant. A price has already ...
KPN055
Unit costing for network &1, activity &2 could not be copied
What causes this issue? An error has occurred during copying of the unit costing for network activity &V1& &V2&.System Response The ...
Click on this link to search all SAP messages.