Do you have any question about this error?
Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 055
Message text: Unit costing for network &1, activity &2 could not be copied
An error has occurred during copying of the unit costing for network
activity &V1& &V2&.
The unit costing is not copied.
Check the messages.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KPN055
- Unit costing for network &1, activity &2 could not be copied ?The SAP error message KPN055 indicates that there is an issue with copying unit costing information for a specific network and activity. This error typically arises during the process of transferring or copying cost estimates or cost planning data in the Project System (PS) module.
Cause:
The error can be caused by several factors, including:
- Missing Master Data: The network or activity may not have the necessary master data set up, such as cost elements or activity types.
- Inconsistent Data: There may be inconsistencies in the data related to the network or activity, such as missing or incorrect cost estimates.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the cost data for the specified network or activity.
- Configuration Issues: There may be configuration settings in the system that prevent the copying of unit costs.
- Locked Objects: The network or activity might be locked for editing by another user or process.
Solution:
To resolve the KPN055 error, you can take the following steps:
Check Master Data: Ensure that all necessary master data for the network and activity is correctly set up. This includes verifying that cost elements and activity types are defined and active.
Review Cost Estimates: Check if there are existing cost estimates for the network and activity. If they are missing or incorrect, you may need to create or adjust them.
Authorization Check: Verify that the user has the appropriate authorizations to access and modify the cost data. You may need to consult with your SAP security team.
Configuration Review: Review the configuration settings in the Project System to ensure that they allow for the copying of unit costs. This may involve checking settings in the controlling area or project profile.
Unlock Objects: If the network or activity is locked, you may need to wait for the lock to be released or contact the user who has locked it to request access.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates that can resolve the issue.
Debugging: If the issue persists, consider using the SAP debugging tools to trace the process and identify where the error occurs.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the KPN055 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
KPN054
A costing for material &2 has already been maintained re WBS el. &1
What causes this issue? The materials in valuated project stock are valued at the level of the WBS element, material, and plant. A price has already ...
KPN053
Valuation for material &1 has already been made in the operative project
What causes this issue? Material &V1& for WBS element &V2& has been valued in the operative project due to a goods receipt. If you tr...
KPN056
Unit costing for component &1 could not be copied
What causes this issue? An error has occurred during copying of the unit costing for material component &V1&. Check the messages generated as...
KPN057
Control could not be generated
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...