Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 585
Message text: Allocation category for & must be changed to "allocatable".
You have specified the allocation category or alternative allocation
category for the actual data '4' ( = non-allocatable activity type )
for business process &V1& in the interface.
However, the master record for the business process has the category
&V2& ( = allocatable activity type ).
Changing between allocatability and non-allocatability, however, is not
allowed.
The planning record is not accepted.
Change category '4' in the call correspondingly.
Error message extract from SAP system. Copyright SAP SE.
KP585
- Allocation category for & must be changed to "allocatable". ?The SAP error message KP585 indicates that there is an issue with the allocation category of a cost element or cost center in the context of cost allocation processes. Specifically, it suggests that the allocation category for a particular object must be changed to "allocatable" in order to proceed with the allocation process.
Cause: The error typically arises when: Cost Element Configuration: The cost element being used in the allocation is not configured as "allocatable." In SAP, cost elements can have different categories, and only those marked as "allocatable" can be used in certain allocation processes. Cost Center Configuration: Similar to cost elements, cost centers must also be configured correctly to allow for allocations. Incorrect Settings in Allocation Structure: The allocation structure may not be set up to allow for the type of allocation you are trying to perform.
Solution: To resolve the KP585 error, you can take the following steps: Check Cost Element Configuration: Go to the transaction
Get instant SAP help. Sign up for our Free Essentials Plan.
KP584
Allocation category for & cannot be changed to "allocatable".
What causes this issue? You entered the allocation category or alternative allocation category for the actual data &V2& for business process ...
KP583
Allocation category & not planned for &.
What causes this issue? You entered the invalid allocation category &V1& for the business process &V2& in the interface.System Respon...
KP586
Enter a resource or a cost element
What causes this issue? When you call up the function module K_COSTS_PLAN_INTERFACE_PERIOD or K_COSTS_PLAN_INTERFACE_TOTAL the system does not transf...
KP587
No detail planning with resource planning
What causes this issue? When calling up function module K_COSTS_PLAN_INTERFACE_* or K_RKP6_INTERFACE_* for object &v1& in cost element &v...
Click on this link to search all SAP messages.