Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 579
Message text: Business process &1 cannot be planned with business transaction &2
You cannot plan activity &v2& on business process &v1&.
The activity RKP2 can only be planned with business processes of
category 1 and 4.
The activity RKPL can only be planned with business processes of
category 2 and 3.
The posting is not made.
Change either the activity when you call the planning data interface or
change the category of the business process.
Error message extract from SAP system. Copyright SAP SE.
KP579
- Business process &1 cannot be planned with business transaction &2 ?The SAP error message KP579 indicates that a specific business process cannot be planned with a particular business transaction. This error typically arises in the context of controlling (CO) and profitability analysis (CO-PA) when there is a mismatch between the business process and the transaction type being used.
Cause: Incompatibility: The business process you are trying to plan is not compatible with the business transaction you are using. This could be due to configuration settings in the system. Missing Configuration: The business process may not be properly configured to allow planning with the specified transaction type. Transaction Type Restrictions: Certain transaction types may have restrictions on the business processes they can be associated with.
Solution: Check Configuration: Review the configuration settings for both the business process and the business transaction in the SAP system. Ensure that they are compatible and correctly set up. Navigate to the configuration settings in the SAP system (Transaction SPRO) and check the
Get instant SAP help. Sign up for our Free Essentials Plan.
KP578
Field & in table COKA cannot be changed
What causes this issue? Via the planning data interface, you have tried to change field &v1& in the table COKA from value &v2& to val...
KP577
Plan version &1 in fiscal year &2 locked for planning
What causes this issue? The plan version &v1& is locked in fiscal year &v2&. In this version, only objects not integrated in plan (fo...
KP580
No header-assigned networks can be planned
What causes this issue? You transferred a network without activity number. However, the planning data interface supports only activity-assigned netwo...
KP581
Enter only one CO object
What causes this issue? You want to plan both the cost center &V1& and the business process &V2& in one row using the K_ACT_PLAN_INTE...
Click on this link to search all SAP messages.