Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 580
Message text: No header-assigned networks can be planned
You transferred a network without activity number. However, the
planning data interface supports only activity-assigned networks.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If the network & is activity-assigned, transfer the activity number in
the VORNR field. Otherwise, transfer another network.
Error message extract from SAP system. Copyright SAP SE.
KP580
- No header-assigned networks can be planned ?The SAP error message KP580 ("No header-assigned networks can be planned") typically occurs in the context of project system (PS) or controlling (CO) modules when you are trying to plan costs or activities for a network that does not have a valid header assignment. This can happen in various scenarios, such as when you are working with networks in project planning or cost planning.
Cause:
- Missing Header Assignment: The network you are trying to plan does not have a valid header assignment. This means that the network is not linked to a project or a WBS (Work Breakdown Structure) element.
- Incorrect Network Status: The network might be in a status that does not allow planning, such as "Not Released" or "Closed."
- Authorization Issues: The user may not have the necessary authorizations to access or plan the network.
- Configuration Issues: There may be configuration settings in the system that prevent planning for certain types of networks.
Solution:
- Check Header Assignment: Ensure that the network is correctly assigned to a project or WBS element. You can do this by navigating to the network in the SAP system and checking its header details.
- Change Network Status: If the network is not released, you may need to release it. This can be done in the network maintenance transaction (e.g., CN22).
- Review Authorizations: Ensure that the user has the necessary authorizations to plan on the network. This may involve checking user roles and permissions in the SAP system.
- Configuration Review: If the issue persists, consult with your SAP configuration team to review the settings related to network planning and ensure they are set up correctly.
- Use Transaction Codes: Use transaction codes like CN21 (Create Network), CN22 (Change Network), and CN41 (Display Network) to manage networks and check their details.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems or controlling.
Get instant SAP help. Start your 7-day free trial now.
KP579
Business process &1 cannot be planned with business transaction &2
What causes this issue? You cannot plan activity &v2& on business process &v1&. The activity RKP2 can only be planned with business p...
KP578
Field & in table COKA cannot be changed
What causes this issue? Via the planning data interface, you have tried to change field &v1& in the table COKA from value &v2& to val...
KP581
Enter only one CO object
What causes this issue? You want to plan both the cost center &V1& and the business process &V2& in one row using the K_ACT_PLAN_INTE...
KP582
Enter only one sender
What causes this issue? You want to plan both the cost center &V1& and the business process &V2& in one row using the K_ACT_PLAN_INTE...
Click on this link to search all SAP messages.