Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 560
Message text: Error in model record for detailed planning & .
Validation of the detailed planning &V1& from the feeder record for
cost center &V4&, cost element &V3&, resulted in errors.
The corresponding feeder record cannot be processed.
Use manual planning for the feeder record to check detailed planning.
After eliminating the error, copy the record anew, using primary cost
selection, during individual processing of the affected cost center.
Error message extract from SAP system. Copyright SAP SE.
KP560
- Error in model record for detailed planning & . ?The SAP error message KP560, which indicates "Error in model record for detailed planning," typically occurs in the context of SAP's Controlling (CO) module, particularly when dealing with planning functions in the CO-OM (Overhead Management) area. This error can arise due to various reasons related to the configuration or data integrity in the planning model. Causes of KP560 Error Missing or Incorrect Model Configuration: The planning model may not be correctly configured, or required settings may be missing. Data Inconsistencies: There may be inconsistencies in the data being used for planning, such as missing master data or incorrect planning versions. Authorization Issues: The user may not have the necessary authorizations to access or modify the planning model. Incorrect Planning Parameters: The parameters set for the planning run may not align with the model's requirements. Versioning Issues: The planning version being used may not be valid or may not exist in the system. Solutions to KP560 Error Check Model
Get instant SAP help. Sign up for our Free Essentials Plan.
KP555
No longer possible to change allocation cost element &1 to &2 with &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KP554
You did not specify a valid real estate object
What causes this issue? You want to transfer a real estate object when you call up the plan data interface. However, there is no complete, unique obj...
KP561
Error in target version record for detailed planning & .
What causes this issue? Validation of detailed planning &V1& for the plan record of cost center &V4&, cost element &V3& in th...
KP562
Error in number assignment for detailed planning.
What causes this issue? An error occurred during number assignment to detailed planning of the plan record for cost center &V1&, cost element...
Click on this link to search all SAP messages.