Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 281
Message text: & not allowed for &
You are not in the logical system that administers the transaction data
for &V2&.
Transaction "&v1&" is not allowed here.
You can use transaction "&v1&" only in logical system &v3&.
Error message extract from SAP system. Copyright SAP SE.
KP281
- & not allowed for & ?The SAP error message KP281 typically indicates an issue related to the controlling area or cost center in the context of cost planning or budgeting. The message "not allowed for &" suggests that the operation you are trying to perform is not permitted for the specified object (like a cost center, internal order, etc.).
Cause: Authorization Issues: The user may not have the necessary authorizations to perform the action on the specified cost object. Incorrect Configuration: The controlling area or cost center may not be properly configured for the operation you are trying to execute. Status of the Cost Object: The cost center or internal order may be in a status that does not allow for planning or budgeting (e.g., it may be closed or inactive). Period Lock: The period you are trying to post to may be locked or closed in the system.
Solution: Check Authorizations: Ensure that the user has the necessary authorizations to perform
Get instant SAP help. Sign up for our Free Essentials Plan.
KP280
Cost element &1 is not assigned to a cost component structure
What causes this issue? You are running activity price calculation in a version in which primary cost components are determined with layout &V2&a...
KP279
&: Activity relationship with zero activity.
What causes this issue? For &V1&, plan activity is 0. Nevertheless, activity input was planned for period(s) &V3&.System Response Th...
KP282
Predistribution of fixed costs locked by &V1&.
What causes this issue? DEFINE &USER& = &V1& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX You want to start the price calculation a...
KP283
&: Costs planned or posted despite zero activity
What causes this issue? The planned or posted activity for &V1& is 0. Despite this, costs have been planned or posted in period(s) &V3&am...
Click on this link to search all SAP messages.