Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 280
Message text: Cost element &1 is not assigned to a cost component structure
You are running activity price calculation in a version in which
primary cost components are determined with layout &V2&.
However, layout &V2& is missing cost element &V1&. The cost components
are therefore incomplete.
Assign cost element &V1& to a cost component in the layout.
Error message extract from SAP system. Copyright SAP SE.
KP280
- Cost element &1 is not assigned to a cost component structure ?The SAP error message KP280 indicates that a specific cost element is not assigned to a cost component structure. This error typically arises during the execution of cost planning or when trying to analyze costs in controlling (CO) modules, particularly in relation to cost component accounting.
Cause:
The primary cause of this error is that the cost element you are trying to use in your planning or reporting is not linked to any cost component structure. Cost component structures are used to categorize costs into different components (like material costs, labor costs, overheads, etc.) for better analysis and reporting.
Solution:
To resolve the KP280 error, you need to ensure that the cost element is properly assigned to a cost component structure. Here are the steps to do this:
Access the Cost Element Master Data:
- Go to transaction code KA01 (Create Cost Element) or KA02 (Change Cost Element).
- Enter the cost element number that is causing the error.
Check the Cost Component Structure Assignment:
- In the cost element master data, navigate to the "Cost Component" tab.
- Check if the cost component structure is assigned. If it is not, you will need to assign it.
Assign the Cost Element to a Cost Component Structure:
- If the cost component structure is not assigned, you can do so by selecting the appropriate cost component structure from the dropdown list.
- Save your changes.
Verify the Assignment:
- After making the changes, you can verify that the cost element is now correctly assigned to the cost component structure by rechecking the cost element master data.
Re-run the Planning or Reporting Process:
- Once the assignment is corrected, try to re-run the planning or reporting process that initially triggered the error.
Related Information:
Get instant SAP help. Start your 7-day free trial now.
KP279
&: Activity relationship with zero activity.
What causes this issue? For &V1&, plan activity is 0. Nevertheless, activity input was planned for period(s) &V3&.System Response Th...
KP278
Ingoing activity relationship in partial iteration.
What causes this issue? In the iterative price calculation framework, the system detected an assignment between &V1& and &V2&. Howeve...
KP281
& not allowed for &
What causes this issue? You are not in the logical system that administers the transaction data for &V2&.System Response Transaction "&...
KP282
Predistribution of fixed costs locked by &V1&.
What causes this issue? DEFINE &USER& = &V1& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX You want to start the price calculation a...
Click on this link to search all SAP messages.