Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 248
Message text: Update not started due to error
A serious error occurred during processing.
Processing is continued as far as possible. However, the results are
not updated.
For more information on this error, see the error list for the entries
before this error. Check these errors carefully. If you still decide
that it is worthwhile to update the values, you can do so using the
update function in the results list.
Error message extract from SAP system. Copyright SAP SE.
KP248
- Update not started due to error ?The SAP error message KP248 ("Update not started due to error") typically occurs in the context of the Controlling (CO) module, particularly when dealing with cost center accounting, internal orders, or other related transactions. This error indicates that there was an issue preventing the update of the relevant data in the database. Causes: Data Inconsistencies: There may be inconsistencies in the data being processed, such as missing or incorrect entries in the master data or transaction data. Authorization Issues: The user may not have the necessary authorizations to perform the update. System Configuration: Incorrect configuration settings in the controlling module or related areas can lead to this error. Technical Issues: There may be underlying technical issues, such as database locks, system performance problems, or issues with the update process itself. Batch Input Issues: If the update is being processed in batch mode, there may be issues with the batch input session. Solutions: Check for Data Inconsistencies: Review the
Get instant SAP help. Sign up for our Free Essentials Plan.
KP247
Cost center & activity type &: political activity price fluctuates
What causes this issue? You determined a manually-entered activity price for cost center &V1&, activity type &V2&. An annual activity...
KP246
Cost center & activity type &: activity is 0
What causes this issue? Activity planning in periods &V3& is not reconciled for cost center &V1&, activity type &V2&. The pla...
KP249
Settings for &2 have been saved
What causes this issue? Your settings for &V2& have been saved for controlling area &V1&.System Response When carrying out &V2&a...
KP250
Cost center & activity type &: costs exist although activity 0
What causes this issue? The plan or actual activity for cost center &V1&, activity type &V2& is 0. However, costs were planned or pos...
Click on this link to search all SAP messages.