Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 247
Message text: Cost center & activity type &: political activity price fluctuates
You determined a manually-entered activity price for cost center &V1&,
activity type &V2&. An annual activity price is also calculated for
version &V3&. The annual activity price means that the activity price
is the same in all periods. This is not the case for the manual
activity price for cost center &V1&, activity type &V2&.
Activity price calculation uses the activity price of period &V4& for
all periods. Since this is a serious error, the values are not updated.
Change the manual activity price of cost center &V1&, activity type
&V2& or set the activity price to iterative. If you set the activity
price to iterative, the SAP System calculates an annual activity price
and sets it for all periods.
Error message extract from SAP system. Copyright SAP SE.
KP247
- Cost center & activity type &: political activity price fluctuates ?The SAP error message KP247 indicates that there is a fluctuation in the price of a political activity associated with a specific cost center and activity type. This error typically arises in the context of controlling (CO) and can be related to various factors, including changes in pricing conditions, currency fluctuations, or inconsistencies in master data.
Cause: Price Fluctuation: The price for the activity type may have changed due to updates in the pricing conditions or changes in the underlying cost structure. Master Data Issues: There may be inconsistencies or errors in the master data for the cost center or activity type. Currency Issues: If the cost center or activity type is associated with different currencies, fluctuations in exchange rates can lead to price changes.
Configuration Issues: Incorrect configuration in the controlling module or in the activity type settings can also lead to this error.
Solution: Check Master Data: Verify the master data for the cost center
Get instant SAP help. Sign up for our Free Essentials Plan.
KP246
Cost center & activity type &: activity is 0
What causes this issue? Activity planning in periods &V3& is not reconciled for cost center &V1&, activity type &V2&. The pla...
KP245
Cost center & activity type & activity < scheduled activity
What causes this issue? Plan activity in period(s) &V3& is not reconciled for cost center &V1&, activity type &V2&. The plan ...
KP248
Update not started due to error
What causes this issue? A serious error occurred during processing.System Response Processing is continued as far as possible. However, the results ...
KP249
Settings for &2 have been saved
What causes this issue? Your settings for &V2& have been saved for controlling area &V1&.System Response When carrying out &V2&a...
Click on this link to search all SAP messages.