Message text: Cost center & activity type &: costs exist although activity 0
The plan or actual activity for cost center &V1&, activity type &V2& is
0. However, costs were planned or posted in period(s) &V3&.
The SAP System cannot calculate activity prices for this activity type
as this would involve division by zero. The plan or actual costs are
ignored in activity price calculation.
Check activity price calculation in planning for activity type &V2& in
cost center &V1& and the costs planned for period(s) &V3&.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP06>Primary Cost Planning</>
For activity price calculation in actual, actual costs are allocated
onto the activity type through splitting, although no activity posting
was made on this activity type.
Error message extract from SAP system. Copyright SAP SE.
KP250
- Cost center & activity type &: costs exist although activity 0 ?The SAP error message KP250 indicates that there are costs recorded for a cost center and activity type combination, but the system is unable to find any actual activity (in this case, it mentions "activity 0"). This typically occurs in the context of controlling and cost accounting within SAP, particularly when dealing with activity-based costing.
Cause:
- Missing Activity Allocation: The error usually arises when there are costs associated with a cost center and activity type, but no actual activities have been allocated or recorded for that period.
- Incorrect Configuration: There may be a configuration issue in the activity type settings or in the cost center settings.
- Data Entry Errors: There could be errors in data entry where costs have been posted without corresponding activity records.
- Timing Issues: The costs may have been posted in a different period than when the activities were recorded, leading to discrepancies.
Solution:
- Check Activity Allocation: Verify that the activity type has been properly allocated to the cost center. Ensure that there are actual activities recorded for the relevant period.
- Review Cost Entries: Look into the cost entries for the cost center and activity type. Ensure that they are valid and correspond to actual activities.
- Adjust Configuration: If there are configuration issues, you may need to adjust the settings for the cost center or activity type in the SAP configuration (transaction codes like OKEQ for activity types and OKKS for cost centers).
- Repost Costs: If costs were posted incorrectly, consider reversing those entries and reposting them with the correct activity allocations.
- Check Period Closing: Ensure that the period has been properly closed and that there are no discrepancies in the postings.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and cost accounting.
Get instant SAP help. Start your 7-day free trial now.
KP249
Settings for &2 have been saved
What causes this issue? Your settings for &V2& have been saved for controlling area &V1&.System Response When carrying out &V2&a...
KP248
Update not started due to error
What causes this issue? A serious error occurred during processing.System Response Processing is continued as far as possible. However, the results ...
KP251
Cost center & activity type &: costs exist although activity 0
What causes this issue? The plan and posted activity for cost center &V1&, activity type &V2& is 0. However, costs were planned or po...
KP252
Cost center & activity type &: activity taken although activity 0
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Syste...