SAP Error Message - Details

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 234

  • Message text: CCtr & activity type & activity type & > sched. activity

  • Show details Hide details
  • What causes this issue?

    The activity quantities planned for cost center &V1&, activity type
    &V2& are not reconciled. The plan quantity for activity type &V2& is
    greater than the plan activity input to the receivers (scheduled
    activity).

    System Response

    This can lead to incorrect activity prices in iterative calculation. In
    particular, cost center &V1&, activity type &V2& is not fully credited.

    How to fix this error?

    Check the plan quantities of activity type &V2& in cost center &V1& and
    the activity input to the receiver cost centers.
    <DS:TRAN.KP26>Execute</>
    <DS:TRAN.KP36>Execute</>

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KP234 - CCtr & activity type & activity type & > sched. activity ?

    The SAP error message KP234 typically indicates an issue related to the assignment of cost centers and activity types in the context of controlling (CO) and cost planning. The message suggests that there is a problem with the scheduling of an activity type for a cost center.

    Cause:

    1. Incorrect Configuration: The cost center or activity type may not be properly configured in the system.
    2. Missing Master Data: The required master data for the cost center or activity type may be missing or incomplete.
    3. Invalid Assignment: The activity type may not be assigned to the cost center in the controlling area.
    4. Period Lock: The period in which you are trying to schedule the activity may be locked or closed.
    5. Authorization Issues: The user may not have the necessary authorizations to perform the action.

    Solution:

    1. Check Configuration: Verify that the cost center and activity type are correctly configured in the system. Ensure that they are active and assigned to the correct controlling area.
    2. Review Master Data: Ensure that all necessary master data for the cost center and activity type is complete and accurate.
    3. Validate Assignments: Check the assignment of the activity type to the cost center. You can do this in the configuration settings under the controlling module.
    4. Open Periods: Ensure that the period you are trying to schedule the activity in is open and not locked.
    5. Authorization Check: Confirm that the user has the necessary authorizations to perform the scheduling action.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like KP26 (for planning activity types) or KS01 (for creating cost centers) to check or modify the relevant data.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on configuring cost centers and activity types in the controlling module.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author