Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 234
Message text: CCtr & activity type & activity type & > sched. activity
The activity quantities planned for cost center &V1&, activity type
&V2& are not reconciled. The plan quantity for activity type &V2& is
greater than the plan activity input to the receivers (scheduled
activity).
This can lead to incorrect activity prices in iterative calculation. In
particular, cost center &V1&, activity type &V2& is not fully credited.
Check the plan quantities of activity type &V2& in cost center &V1& and
the activity input to the receiver cost centers.
<DS:TRAN.KP26>Execute</>
<DS:TRAN.KP36>Execute</>
Error message extract from SAP system. Copyright SAP SE.
KP234
- CCtr & activity type & activity type & > sched. activity ?The SAP error message KP234 typically indicates an issue related to the assignment of cost centers and activity types in the context of controlling (CO) and cost planning. The message suggests that there is a problem with the scheduling of an activity type for a cost center.
Cause: Incorrect Configuration: The cost center or activity type may not be properly configured in the system. Missing Master Data: The required master data for the cost center or activity type may be missing or incomplete. Invalid Assignment: The activity type may not be assigned to the cost center in the controlling area. Period Lock: The period in which you are trying to schedule the activity may be locked or closed. Authorization Issues: The user may not have the necessary authorizations to perform the action.
Solution: Check Configuration: Verify that the cost center and activity type are correctly configured in the system. Ensure that they are active and assigned to the
Get instant SAP help. Sign up for our Free Essentials Plan.
KP233
Planning locked by user &
What causes this issue? DEFINE &USER& = &V1& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX User &V1& is planning in controll...
KP232
Version does not exist
What causes this issue? Version &V2& does not exist in controlling area &V1&.System Response The SAP System cannot process this vers...
KP235
Sender in an activity relationship has no activity.
What causes this issue? During activity price calculation, the SAP System determined an exchange of activities between cost center &V1&, acti...
KP236
Cost center &, activity type &: Activity < scheduled activity.
What causes this issue? The activity quantities planned for cost center &V1&, activity &V2& are not reconciled for period(s) &V3&...
Click on this link to search all SAP messages.