Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 233
Message text: Planning locked by user &
DEFINE &USER& = &V1&
INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX
User &V1& is planning in controlling area &V2&, version &V3&. Price
calculation is therefore not possible.
If price calculation is not started in a test run, it is not started
because update postings are not possible.
When you start in a test run, there is no option to post at the end of
processing, but you are able to calculate the prices.
Try again later if you need to update the plan reconciliation. If you
are only interested in price calculations, you can carry out the test
run.
Error message extract from SAP system. Copyright SAP SE.
KP233
- Planning locked by user & ?The SAP error message KP233, which states "Planning locked by user &," typically occurs in the context of planning activities in SAP Controlling (CO) modules, particularly when using the planning functions in SAP's CO-OM (Overhead Cost Controlling) or CO-PA (Profitability Analysis).
Cause:
The error indicates that a planning session is currently locked by a specific user (denoted by the "&" in the message). This can happen for several reasons:
- User Lock: A user is currently editing or has opened a planning session, preventing others from making changes.
- Session Timeout: A user may have left a session open, and the system has not released the lock.
- System Error: Occasionally, a system error or crash may leave a lock in place.
Solution:
To resolve the KP233 error, you can take the following steps:
Identify the Locking User:
- Check the user who has locked the planning session. This can often be found in the error message itself or by using transaction codes like
SM12
(to view and manage locks) orSM21
(to check system logs).Contact the User:
- If you can identify the user, reach out to them to see if they can close their session or save their work and exit.
Release the Lock:
- If the user is unavailable or the session is stuck, you may need to manually release the lock. This can be done by:
- Going to transaction
SM12
, entering the user ID, and deleting the lock entry. Be cautious with this step, as it may lead to data loss if the user is actively working.Check for Background Jobs:
- Sometimes, background jobs may hold locks. Check if any background jobs are running that might be causing the lock.
System Restart:
- In rare cases, a system restart may be necessary to clear persistent locks, but this should be done with caution and typically as a last resort.
Related Information:
Transaction Codes:
SM12
: To view and manage locks.SM21
: To check system logs for errors.KP06
, KP07
, KP08
: Planning transactions in CO.User Roles and Authorizations:
Documentation:
SAP Notes:
By following these steps, you should be able to resolve the KP233 error and continue with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
KP232
Version does not exist
What causes this issue? Version &V2& does not exist in controlling area &V1&.System Response The SAP System cannot process this vers...
KP231
System error: number overflow in posting line
What causes this issue? A system error occurred during editing of the line items for updates in activity price iteration. The maximum number of rows ...
KP234
CCtr & activity type & activity type & > sched. activity
What causes this issue? The activity quantities planned for cost center &V1&, activity type &V2& are not reconciled. The plan quantit...
KP235
Sender in an activity relationship has no activity.
What causes this issue? During activity price calculation, the SAP System determined an exchange of activities between cost center &V1&, acti...
Click on this link to search all SAP messages.