Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 233
Message text: Planning locked by user &
DEFINE &USER& = &V1&
INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX
User &V1& is planning in controlling area &V2&, version &V3&. Price
calculation is therefore not possible.
If price calculation is not started in a test run, it is not started
because update postings are not possible.
When you start in a test run, there is no option to post at the end of
processing, but you are able to calculate the prices.
Try again later if you need to update the plan reconciliation. If you
are only interested in price calculations, you can carry out the test
run.
Error message extract from SAP system. Copyright SAP SE.
KP233
- Planning locked by user & ?The SAP error message KP233, which states "Planning locked by user &," typically occurs in the context of planning activities in SAP Controlling (CO) modules, particularly when using the planning functions in SAP's CO-OM (Overhead Cost Controlling) or CO-PA (Profitability Analysis).
Cause: The error indicates that a planning session is currently locked by a specific user (denoted by the "&" in the message). This can happen for several reasons: User Lock: A user is currently editing or has opened a planning session, preventing others from making changes. Session Timeout: A user may have left a session open, and the system has not released the lock. System Error: Occasionally, a system error or crash may leave a lock in place.
Solution: To resolve the KP233 error, you can take the following steps: Identify the Locking User: Check the user who has locked the planning session. This can often be found in the error message itself or by using transaction codes
Get instant SAP help. Sign up for our Free Essentials Plan.
KP232
Version does not exist
What causes this issue? Version &V2& does not exist in controlling area &V1&.System Response The SAP System cannot process this vers...
KP231
System error: number overflow in posting line
What causes this issue? A system error occurred during editing of the line items for updates in activity price iteration. The maximum number of rows ...
KP234
CCtr & activity type & activity type & > sched. activity
What causes this issue? The activity quantities planned for cost center &V1&, activity type &V2& are not reconciled. The plan quantit...
KP235
Sender in an activity relationship has no activity.
What causes this issue? During activity price calculation, the SAP System determined an exchange of activities between cost center &V1&, acti...
Click on this link to search all SAP messages.