Do you have any question about this error?
Message type: E = Error
Message class: KO - Master data for CO orders
Message number: 138
Message text: Processing group & is full (choose a different one)
A processing group can contain up to 99 combinations of settlement cost
element / receiver cost center. This number has been exceeded in
processing group &v1&.
Select an already existing combination of the settlement cost element
and receiver cost center from processing group &v1&, or select a
different processing group.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message KO138, which states "Processing group & is full (choose a different one)," typically occurs in the context of production order processing or when dealing with capacity planning in SAP. This error indicates that the specified processing group has reached its maximum capacity, and no additional operations can be assigned to it.
Cause:
- Capacity Limit Reached: The processing group has a defined limit on the number of operations or tasks it can handle simultaneously, and this limit has been reached.
- Configuration Issues: The configuration settings for the processing group may not be set up correctly, leading to an incorrect assessment of capacity.
- Resource Allocation: There may be a misallocation of resources, where too many operations are assigned to a single processing group.
- Scheduling Conflicts: Conflicts in scheduling can lead to an overload of the processing group.
Solution:
- Choose a Different Processing Group: The simplest solution is to select a different processing group that has available capacity.
- Increase Capacity: If feasible, increase the capacity of the processing group in the configuration settings to allow for more operations.
- Reassign Operations: Review the operations assigned to the processing group and reassign some of them to other processing groups with available capacity.
- Check Configuration: Verify the configuration settings for the processing group to ensure they are set correctly and reflect the actual capacity.
- Monitor Resource Utilization: Use SAP tools to monitor the utilization of resources and adjust assignments as necessary to balance the load across processing groups.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the KO138 error and continue with your production processes.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
KO137 Error in text processing (notify your system administrator)
What causes this issue? An error occurred in text processing.How to fix this er...
KO136 Enter the business area
What causes this issue? Company &v1& intends to create business-area ba...
KO139 Change document: &
Self-Explanatory Message Since SAP believes that this specific error message is ...
KO140 Currently not possible to save the settlement parameters
What causes this issue? The settlement parameters cannot be saved at this time,...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.