Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 055
Message text: COAr & must be regenerated
The ledger settings are incomplete. New company codes may need to be
assigned to the controlling area.
Transfer could not be performed.
Use the function <DS:TRAN.0KE3>Regenerate</> to complete the ledger
settings.
Error message extract from SAP system. Copyright SAP SE.
KM055
- COAr & must be regenerated ?The SAP error message KM055, which states "COAr & must be regenerated," typically relates to issues with the calculation of cost estimates in the Controlling (CO) module, particularly in the context of Activity-Based Costing (ABC) or Cost Object Controlling.
Cause:
The error message KM055 usually indicates that the cost estimate for a particular cost object (like a cost center, internal order, or project) is outdated or invalid. This can happen due to various reasons, such as:
- Changes in Master Data: If there have been changes in the master data (like cost center, activity types, or cost elements) that affect the cost calculation, the existing cost estimates may no longer be valid.
- Changes in Costing Variants: If the costing variant used for the cost estimate has been modified, it may require regeneration of the cost estimate.
- Data Consistency Issues: Inconsistencies in the data or configuration settings can lead to the need for regeneration.
Solution:
To resolve the KM055 error, you can follow these steps:
Regenerate the Cost Estimate:
- Navigate to the relevant transaction for cost estimate generation (e.g., CK11N for cost estimates).
- Select the appropriate cost object and regenerate the cost estimate.
Check Master Data:
- Review any recent changes made to master data that could affect the cost estimate.
- Ensure that all relevant data is consistent and correctly configured.
Review Costing Variants:
- Check if there have been any changes to the costing variants that might require you to regenerate the cost estimate.
Run Consistency Checks:
- Use transaction codes like CKR1 or CKR2 to run consistency checks on the cost estimates and identify any discrepancies.
Consult Documentation:
- Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant specializing in the Controlling module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KM054
User-defined ledgers must always begin with a letter
What causes this issue? You tried to create a new profit center ledger &V1&, which begins with a number. According to the naming conventions ...
KM053
Enter a controlling area
What causes this issue? System Response The system issues an error message and will not allow you to continue with this transaction until the error i...
KM056
Enter either a company code set or a single value
What causes this issue? Profit center ledger name &V1& is reserved for Financial Accounting.System Response The ledger cannot be generated f...
KM057
&1 is not a set for field &2 of Table &3
What causes this issue? &V1& is not a set in field &V2& of table &V3& and not of a similar dimension (see table SETDTEL). Set...
Click on this link to search all SAP messages.