Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 020
Message text: Period(s) to be changed must include all of the period of validity
The controlling area and the profit center group (subhierarchy) must be
identical in all existing valid periods.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Select a period which covers all existing valid periods.
Error message extract from SAP system. Copyright SAP SE.
KM020
- Period(s) to be changed must include all of the period of validity ?The SAP error message KM020 ("Period(s) to be changed must include all of the period of validity") typically occurs in the context of SAP Controlling (CO) when you are trying to change a period or a set of periods in a transaction that requires the entire validity period to be included in the change.
Cause:
This error usually arises when:
- You are attempting to change a period that does not encompass the entire validity range of the object you are working with (e.g., a cost center, internal order, or other controlling objects).
- The periods you selected for the change do not cover the full range of the validity period defined for the object in question.
Solution:
To resolve the KM020 error, you can take the following steps:
Check Validity Period: Verify the validity period of the object you are trying to change. You can do this by navigating to the relevant master data (e.g., cost center master data) and checking the validity dates.
Select Correct Periods: Ensure that the periods you are trying to change include the entire validity period. If the validity period is from January to December, you must select all months within that range.
Adjust Periods: If you need to change only specific periods, you may need to adjust the validity period of the object first, if that is permissible in your business process.
Consult Documentation: Review the SAP documentation or help files related to the specific transaction you are using to understand the requirements for changing periods.
User Authorization: Ensure that you have the necessary authorizations to make changes to the periods in question.
Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the KM020 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KM019
Profit center group & cannot be used here
What causes this issue? The profit center group <(>&<)> is not assigned to the standard hierarchy.System Response The system issues ...
KM018
New analysis period may not overlap with original
What causes this issue? The time period you have selected exceeds the valid time period of the profit center.System Response The system issues an er...
KM021
Hierarchy is locked and therefore cannot be changed at present
What causes this issue? You tried to change a profit center group.System Response The group you tried to change, or a group that contains that group...
KM022
& may not be used as a profit center name
What causes this issue? In customizing, you defined a name for a profit center on which data that cannot be assigned immediately can be stored tempor...
Click on this link to search all SAP messages.