Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 020
Message text: Period(s) to be changed must include all of the period of validity
The controlling area and the profit center group (subhierarchy) must be
identical in all existing valid periods.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Select a period which covers all existing valid periods.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message KM020 ("Period(s) to be changed must include all of the period of validity") typically occurs in the context of SAP Controlling (CO) when you are trying to change a period or a set of periods in a transaction that requires the entire validity period to be included in the change.
Cause:
This error usually arises when:
You are attempting to change a period that does not encompass the entire validity range of the object you are working with (e.g., a cost center, internal order, or other controlling objects).
The periods you selected for the change do not cover the full range of the validity period defined for the object in question.
Solution:
To resolve the KM020 error, you can take the following steps:
Check Validity Period: Verify the validity period of the object you are trying to change. You can do this by navigating to the relevant master data (e.g., cost center master
Get instant SAP help. Sign up for our Free Essentials Plan.
KM019 Profit center group & cannot be used here
What causes this issue? The profit center group <(>&<)> is not assigned to the standard hierarchy.System Response The system issues ...
KM018 New analysis period may not overlap with original
What causes this issue? The time period you have selected exceeds the valid time period of the profit center.System Response The system issues an er...
KM021 Hierarchy is locked and therefore cannot be changed at present
What causes this issue? You tried to change a profit center group.System Response The group you tried to change, or a group that contains that group...
KM022 & may not be used as a profit center name
What causes this issue? In customizing, you defined a name for a profit center on which data that cannot be assigned immediately can be stored tempor...
Click on this link to search all SAP messages.