How To Fix KM020 - Period(s) to be changed must include all of the period of validity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KM - Error messages for Profit Center Accounting

  • Message number: 020

  • Message text: Period(s) to be changed must include all of the period of validity

  • Show details Hide details
  • What causes this issue?

    The controlling area and the profit center group (subhierarchy) must be
    identical in all existing valid periods.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Select a period which covers all existing valid periods.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KM020 - Period(s) to be changed must include all of the period of validity ?

    The SAP error message KM020 ("Period(s) to be changed must include all of the period of validity") typically occurs in the context of SAP Controlling (CO) when you are trying to change a period or a set of periods in a transaction that requires the entire validity period to be included in the change.

    Cause:

    This error usually arises when:

    1. You are attempting to change a period that does not encompass the entire validity range of the object you are working with (e.g., a cost center, internal order, or other controlling objects).
    2. The periods you selected for the change do not cover the full range of the validity period defined for the object in question.

    Solution:

    To resolve the KM020 error, you can take the following steps:

    1. Check Validity Period: Verify the validity period of the object you are trying to change. You can do this by navigating to the relevant master data (e.g., cost center master data) and checking the validity dates.

    2. Select Correct Periods: Ensure that the periods you are trying to change include the entire validity period. If the validity period is from January to December, you must select all months within that range.

    3. Adjust Periods: If you need to change only specific periods, you may need to adjust the validity period of the object first, if that is permissible in your business process.

    4. Consult Documentation: Review the SAP documentation or help files related to the specific transaction you are using to understand the requirements for changing periods.

    5. User Authorization: Ensure that you have the necessary authorizations to make changes to the periods in question.

    6. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: The error may occur in various transactions related to controlling, such as KP06 (Cost Center Planning), KSB1 (Cost Centers: Actual Line Items), or others.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional context.
    • Configuration Settings: Review the configuration settings in the controlling module to ensure that they align with your business processes and requirements.

    By following these steps, you should be able to identify the cause of the KM020 error and implement the necessary changes to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant