How To Fix KJ431 - Plan overrun "F-H", assignment of line IDs: combine & with & or &


KJ431 - Overview

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 431

  • Message text: Plan overrun "F-H", assignment of line IDs: combine & with & or &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KJ431 - Plan overrun "F-H", assignment of line IDs: combine & with & or & ?
    The SAP error message KJ431, which indicates a "Plan overrun" with the specific details about the assignment of line IDs, typically arises in the context of controlling and planning within SAP's CO (Controlling) module. This error suggests that there is a discrepancy between the planned and actual values for a particular cost element or cost center.
    
    Cause: Plan Overrun: The error indicates that the actual costs have exceeded the planned costs for a specific period or cost object. This can happen due to various reasons, such as unexpected expenses, changes in project scope, or incorrect planning data. Assignment Issues: The message mentions "assignment of line IDs," which suggests that there may be issues with how costs are assigned to different line items or cost centers. This could be due to incorrect configuration or data entry errors. Data Consistency: There may be inconsistencies in the data between the planning and actual postings, leading to this

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author