Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 371
Message text: Profit basis & can only be used for project structure "P"
You have chosen a valuation method for results analysis for which a
profit basis is set that uses <DS:GLOS.fixed_price_agreement>fixed
price agreements</>. These profit bases can only be used with project
structure "P" (summarize planning data and actual data up to the next
internal/external billing element or WIP element).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go into Customizing and choose another project structure in the
valuation method.
Error message extract from SAP system. Copyright SAP SE.
KJ371
- Profit basis & can only be used for project structure "P" ?The SAP error message KJ371 indicates that the profit basis you are trying to use is not compatible with the project structure type "P" (which typically refers to a project in SAP Project System). This error usually arises when there is a mismatch between the profit basis settings and the project structure type.
Cause:
- Incompatible Profit Basis: The profit basis you are trying to assign or use is not defined for project structures of type "P". This could be due to configuration settings in the system.
- Configuration Issues: The settings in the controlling area or project profile may not allow the use of the specified profit basis for the project type you are working with.
- Project Type Restrictions: Certain project types may have specific profit basis requirements that are not being met.
Solution:
Check Profit Basis Configuration:
- Go to the configuration settings in SAP (Transaction code SPRO).
- Navigate to the Project System settings and check the configuration for profit basis.
- Ensure that the profit basis you are trying to use is allowed for project type "P".
Review Project Profile:
- Check the project profile assigned to your project.
- Ensure that the profit basis is correctly defined in the project profile settings.
Adjust Project Structure:
- If the project structure type is not appropriate for the profit basis you want to use, consider changing the project structure or selecting a different profit basis that is compatible.
Consult Documentation:
- Review SAP documentation or help resources related to project systems and profit basis configurations for more detailed guidance.
Contact SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support or your internal SAP team for assistance.
Related Information:
By following these steps, you should be able to identify the cause of the KJ371 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
KJ370
Profit basis & can only be used for projects
What causes this issue? You have chosen a valuation method for <DS:GLOS.results_analysis>results analysis</> for which a profit basis has...
KJ369
Do not use profit indicator &2 with results analysis type &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ372
Res. anal. not possible for project structure P with profit basis &
What causes this issue? You have chosen a valuation method for <DS:GLOS.results_analysis>results analysis</> for which the project struct...
KJ373
Results analysis type S only for orders with periodic settlement
What causes this issue? You can calculate <DS:GLOS.work_in_process>work in process</> at <DS:GLOS.3526B75FAFAB52B9E10000009B38F974>...
Click on this link to search all SAP messages.