Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 365
Message text: Results analysis type & cannot be used for planned results analysis
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KJ365
- Results analysis type & cannot be used for planned results analysis ?The SAP error message KJ365 indicates that the results analysis type specified cannot be used for planned results analysis. This error typically arises in the context of project accounting or controlling when trying to perform results analysis on a project or internal order.
Cause:
The error can occur due to several reasons:
- Incorrect Results Analysis Type: The results analysis type you are trying to use may not be configured for planned results analysis. Each results analysis type has specific settings that determine how it can be used.
- Configuration Issues: The configuration for the results analysis type in the system may not be set up correctly. This includes settings in the controlling area or project definition.
- Missing or Incorrect Master Data: The project or internal order may not have the necessary master data or settings that align with the results analysis type.
- Incompatibility with the Project: The results analysis type may not be compatible with the specific project or internal order you are working with.
Solution:
To resolve the KJ365 error, you can take the following steps:
Check Results Analysis Type Configuration:
- Go to the configuration settings for results analysis types in SAP (Transaction code: OKG1).
- Verify that the results analysis type you are using is set up for planned results analysis.
Review Project Settings:
- Check the project or internal order settings to ensure that they are compatible with the results analysis type.
- Ensure that the project is correctly defined and that all necessary master data is in place.
Consult Documentation:
- Review SAP documentation or help files related to results analysis types to understand their intended use and configuration.
Adjust Master Data:
- If there are missing or incorrect master data entries, update them accordingly. This may include cost elements, activity types, or other relevant data.
Test with Different Results Analysis Type:
- If possible, try using a different results analysis type that is known to work for planned results analysis to see if the issue persists.
Consult with SAP Support:
- If the issue cannot be resolved through the above steps, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the KJ365 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ364
Customizing for WIP calculation: maintain status DLV and TECO
What causes this issue? For the calculation of <DS:GLOS.work_in_process>work in process</> according to the actual cost method, you must ...
KJ363
Production order has status DLV/TECO: Set "cancel WIP"
What causes this issue? The production order has either the status DLV (Delivered) or TECO (Technically completed). <DS:GLOS.work_in_process>Wo...
KJ366
Profit base & cannot be used with results analysis type &
What causes this issue? You have selected a profit basis in the valuation method that cannot be used with results analysis type &V2&.System R...
KJ367
Do not use results reserve &2 with profit indicator &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.