How To Fix KJ363 - Production order has status DLV/TECO: Set "cancel WIP"


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 363

  • Message text: Production order has status DLV/TECO: Set "cancel WIP"

  • Show details Hide details
  • What causes this issue?

    The production order has either the status DLV (Delivered) or TECO
    (Technically completed). <DS:GLOS.work_in_process>Work in process</>
    may have been calculated for this order in a previous period and
    transferred to Financial Accounting during settlement.
    The work in process must be canceled with status DLV or TECO. The
    setting in Customizing for <DS:GLOS.WIP_calculation>WIP calculation</>
    must specify that WIP is canceled when the order has one of these
    statuses.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Change the Customizing settings for WIP calculation such that work in
    process is canceled at the status DLV and the status TECO.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KJ363 - Production order has status DLV/TECO: Set "cancel WIP" ?
    The SAP error message KJ363 indicates that a production order has a status of either DLV (Delivered) or TECO (Technically Completed), and it is suggesting that you need to set the "cancel WIP" (Work in Progress) indicator. This error typically arises when you attempt to perform certain actions on a production order that is no longer in an active state.
    
    Cause: Order Status: The production order is either delivered (DLV) or technically completed (TECO), which means that it is not in a state where you can perform further transactions that affect WIP. WIP Calculation: The system is trying to calculate WIP for an order that is already completed or delivered, which is not allowed.
    Solution: To resolve this error, you can follow these steps: Check Order Status: Verify the status of the production order. If it is indeed in DLV or TECO status, you will need to take appropriate actions based on your business process. Cancel WIP:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant