Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 287
Message text: The calculated costs are too high
The calculated costs are the result of the following formula:
Planned costs * Actual qty / Planned qty
The result of this formula exceeds the maximum permitted size of the
currency fields.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the planned costs and the planned quantity of the object to be
processed. The ratio of the planned costs to the planned quantity, or
the ratio of the actual quantity to the planned quantity, may be too
high.
Error message extract from SAP system. Copyright SAP SE.
KJ287
- The calculated costs are too high ?The SAP error message KJ287, "The calculated costs are too high," typically occurs in the context of cost planning or cost estimation within SAP, particularly in modules like Controlling (CO) or Project System (PS). This error indicates that the system has determined that the costs associated with a particular activity, project, or order exceed a predefined threshold or limit.
Causes:
- Cost Overrun: The calculated costs for a project or order exceed the budget or planned costs.
- Incorrect Data Entry: There may be incorrect or unrealistic data entered in the cost planning or estimation process.
- Configuration Issues: The system may be configured with overly strict limits or thresholds for cost calculations.
- Missing Master Data: Required master data (like cost centers, activity types, or pricing conditions) may be missing or incorrectly set up.
- Currency Conversion Issues: If there are currency conversion factors involved, discrepancies can lead to inflated cost calculations.
Solutions:
- Review Cost Estimates: Check the cost estimates and ensure that they are realistic and based on accurate data. Adjust the estimates if necessary.
- Adjust Budget Limits: If the costs are justified, consider adjusting the budget limits or thresholds in the system to allow for higher costs.
- Correct Data Entry: Verify that all data entries related to costs, such as labor rates, material costs, and overheads, are accurate and up to date.
- Check Configuration: Review the configuration settings in the controlling area or project settings to ensure that they align with your organization's cost management policies.
- Validate Master Data: Ensure that all relevant master data is complete and correctly configured. This includes cost centers, internal orders, and activity types.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and its context.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
KJ286
The profit percentage is too high
What causes this issue? The profit percentage is the result of the following formula: (Planned revenue - Planned costs) * 100 / Planned costs The res...
KJ285
The calculated revenues are too high
What causes this issue? The calculated revenue is the result of the following formula: Cumulative actual costs / Planned costs of valuation * Planned...
KJ288
The calculated revenues are too high
What causes this issue? The calculated revenue is the result of the following formula: Planned revenue * Actual qty / Planned qty The result of this ...
KJ289
There is no object list for postprocessing
What causes this issue? There is no object list for postprocessing, for one of the following reasons: all objects were free of errors, and the functi...
Click on this link to search all SAP messages.